Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WXP043 - Planning step &2 is not defined for planning scenario &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WXP - Retail Planning

  • Message number: 043

  • Message text: Planning step &2 is not defined for planning scenario &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WXP043 - Planning step &2 is not defined for planning scenario &1 ?

    Certainly! Here's a detailed explanation for the SAP error message:


    SAP Error Message:

    WXP043: Planning step &2 is not defined for planning scenario &1


    Cause:

    This warning message occurs when you try to use or reference a planning step in a planning scenario that has not been defined or maintained in the system. In SAP Integrated Business Planning (IBP) or SAP APO (Advanced Planning and Optimization), planning steps are part of the planning process configuration and must be explicitly created and assigned to the relevant planning scenario.

    • Planning Scenario (&1): This is the overall planning context or process (e.g., Demand Planning, Supply Planning).
    • Planning Step (&2): This is a specific step or phase within the planning scenario (e.g., Forecast, Consensus Demand, Supply Planning).

    If the planning step you are trying to use does not exist or is not assigned to the planning scenario, the system raises this warning.


    When does it occur?

    • When executing planning functions or macros that reference a planning step not defined in the scenario.
    • During data loads or planning runs where the planning step is specified but missing in configuration.
    • When customizing or setting up planning scenarios and steps, if the step is omitted or incorrectly maintained.

    Solution:

    1. Check Planning Scenario and Steps Configuration:

      • Go to the SAP customizing transaction or IMG path where planning scenarios and steps are maintained.
      • For SAP APO (e.g., Demand Planning):
        • Use transaction /SAPAPO/MC9 or /SAPAPO/MC8 to check planning scenarios and steps.
        • Or use transaction /SAPAPO/SDP94 for Supply Planning.
      • For SAP IBP:
        • Check the planning area and planning steps in the SAP IBP configuration UI or via the relevant configuration files.
    2. Define or Assign the Missing Planning Step:

      • If the planning step does not exist, create it.
      • Assign the planning step to the relevant planning scenario.
      • Ensure the planning step is active and correctly configured.
    3. Verify Planning Function or Macro:

      • Check the planning function or macro that references the planning step.
      • Correct the planning step name or code if it is misspelled or incorrect.
    4. Transport and Synchronize:

      • If changes are made in a development system, transport them to quality and production.
      • Synchronize planning objects if necessary.

    Related Information:

    • SAP Notes: Check SAP Notes related to planning step configuration for your specific SAP version.
    • Documentation: Refer to SAP APO or SAP IBP documentation on planning scenarios and steps.
    • Transactions:
      • /SAPAPO/MC9 - Planning Scenario Maintenance
      • /SAPAPO/MC8 - Planning Step Maintenance
      • /SAPAPO/SDP94 - Supply Network Planning
    • Common Terms:
      • Planning Scenario: Defines the overall planning process.
      • Planning Step: Defines individual steps/phases within the scenario.
      • Planning Function: Logic or calculation step that may reference planning steps.

    Summary:

    Aspect Details
    Error Planning step &2 not defined for scenario &1
    Cause Missing or unassigned planning step in scenario
    Solution Define and assign the planning step to scenario
    Check Planning scenario and step configuration, planning functions
    Tools SAP APO transactions /SAPAPO/MC9, /SAPAPO/MC8

    If you provide the exact planning scenario and step names, I can help you with more specific instructions.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant