- One parameter has been maintained for load building and investment buying ?The SAP error message WVLBCHECK033 typically occurs in the context of load building and investment buying processes within the SAP system. This error indicates that there is a conflict or inconsistency in the parameters set for load building and investment buying. Specifically, it suggests that one of the parameters has been maintained, but the other has not, leading to a situation where the system cannot proceed with the operation.
Cause:
The error is usually caused by:
- Inconsistent Parameter Settings: One of the required parameters for load building or investment buying is set, while the corresponding parameter is not. This inconsistency prevents the system from executing the intended operation.
- Configuration Issues: There may be issues in the configuration settings related to load building and investment buying in the SAP system.
- Missing Master Data: Required master data for either load building or investment buying may be incomplete or missing.
Solution:
To resolve the error, you can take the following steps:
Check Parameter Settings:
- Go to the configuration settings for load building and investment buying in the SAP system.
- Ensure that all required parameters are correctly maintained. If one parameter is set, make sure the corresponding parameter is also set.
Review Configuration:
- Navigate to the relevant configuration areas in the SAP system (e.g., SPRO) and verify the settings for load building and investment buying.
- Make adjustments as necessary to ensure consistency.
Validate Master Data:
- Check the master data related to load building and investment buying. Ensure that all necessary data is complete and correctly maintained.
- If any data is missing, update it accordingly.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on the parameters involved in load building and investment buying.
Testing:
- After making the necessary adjustments, test the process again to see if the error persists.
Seek Support:
- If the issue continues, consider reaching out to your SAP support team or consulting with SAP experts who can provide more tailored assistance based on your specific configuration and setup.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the WVLBCHECK033 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
WVLBCHECK032
No parameters maintained for load building and investment buying
How to fix this error? In Customizing for load building, maintain <DS:SIMG.W_ZE_EK_0210.SIMG_OLME>parameters for load building and for investme...
WVLBCHECK031
Number range and interval for log exists
&Cause& The <DS:SIMG.W_ZE_EK_0212.SIMG_OLME>number ranges for log book</> are maintained in Customizing for load building. Number...
WVLBCHECK034
More than one parameters maintained for load building and investment buy
System Response The first <DS:SIMG.W_ZE_EK_0210.SIMG_OLME>parameter for load building and investment buying</> only is used.Error messag...
WVLBCHECK035
No restrictions maintained
How to fix this error? Maintain <DS:SIMG.W_ZE_EK_0240.SIMG_OLME>restrictions</> in Customizing for load building. INCLUDE ISR_CUSTOMIZING...
Click on this link to search all SAP messages.