Do you have any question about this error?
Message type: E = Error
Message class: WVLB - Messages for Load Building
Message number: 138
Message text: Load building not necessary today
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
WVLB138
- Load building not necessary today ?The SAP error message WVLB138: Load building not necessary today typically occurs in the context of logistics and transportation management within the SAP system. This message indicates that the system has determined that there are no shipments or deliveries that require load building for the specified date.
Cause:
- No Deliveries or Shipments: There may be no deliveries or shipments scheduled for the day in question.
- Load Building Criteria Not Met: The criteria for load building (such as minimum quantity, weight, or volume) may not be met.
- Planning Settings: The planning settings or parameters may not be configured to generate load building for the current date.
- Date Configuration: The date being checked may not be a valid date for load building, possibly due to scheduling or operational constraints.
Solution:
- Check Deliveries: Verify if there are any deliveries or shipments scheduled for the date in question. If there are none, then load building is not necessary.
- Review Load Building Criteria: Ensure that the criteria for load building are correctly set up and that there are sufficient deliveries to meet those criteria.
- Adjust Planning Parameters: If necessary, adjust the planning parameters in the system to allow for load building on the desired date.
- Check Date Settings: Confirm that the date you are trying to perform load building for is correct and falls within the operational schedule.
- Run Load Building Again: If you have made changes or added deliveries, try running the load building process again.
Related Information:
/SCMTMS/LOAD
for load building or /SCMTMS/PLANNING
for planning-related activities.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
WVLB137
Reason for termination of ROC alg.:maximum range of coverage (&1) reached
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WVLB136
Reason for termination of ROC alg.: No additional qty in last step!
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WVLB139
Material &1 cannot be ordered automatically for plant &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WVLB140
Current range of coverage in plant &1 for matl &2 (forecast: &4) &3 days
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.