How To Fix WVLB133 - Delivery date for pur. reqs in building load from &1 to &2


WVLB133 - Overview

  • Message type: E = Error

  • Message class: WVLB - Messages for Load Building

  • Message number: 133

  • Message text: Delivery date for pur. reqs in building load from &1 to &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WVLB133 - Delivery date for pur. reqs in building load from &1 to &2 ?
    The SAP error message WVLB133 indicates an issue with the delivery date for purchase requisitions when trying to create a building load. This error typically arises in the context of logistics and supply chain management, particularly when dealing with transportation and delivery scheduling.
    
    Cause: The error message WVLB133 usually occurs due to one of the following reasons: Inconsistent Delivery Dates: The delivery dates for the purchase requisitions being processed do not align with the expected delivery dates for the building load. This can happen if the requisitions have different delivery dates that cannot be accommodated within the same load.
    Configuration Issues: There may be configuration settings in the SAP system that are not set up correctly, leading to discrepancies in how delivery dates are handled. Data Entry Errors: Incorrect data entry in the purchase requisitions or related documents can lead to mismatched delivery dates. Planning Parameters: The planning parameters set in the system may not allow

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant