How To Fix WT714 - No MRP type was entered for replenishment


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WT - Retail: Replenishment

  • Message number: 714

  • Message text: No MRP type was entered for replenishment

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WT714 - No MRP type was entered for replenishment ?

    Certainly! Here's a detailed explanation for the SAP error message WT714: No MRP type was entered for replenishment:


    Error Message

    WT714: No MRP type was entered for replenishment


    Cause

    This error occurs during the Warehouse Management (WM) replenishment process when the system tries to create a replenishment request or transfer order but cannot determine the MRP type for the material. The MRP type is essential because it defines how the material requirements planning (MRP) is carried out for the material.

    In other words, the system needs the MRP type to know how to plan or trigger replenishment, but the material master record does not have an MRP type maintained, or the system cannot find it in the context of the replenishment.


    Where it typically occurs

    • During automatic replenishment in Warehouse Management.
    • When creating transfer orders or replenishment requests.
    • In processes involving storage location to storage location replenishment.
    • When the system tries to determine replenishment strategy but lacks MRP type info.

    Solution

    1. Check the Material Master:

      • Go to transaction MM03 (Display Material).
      • Check the MRP 1 view.
      • Verify that the MRP type field is maintained for the material.
      • If it is blank, maintain an appropriate MRP type (e.g., PD, VB, etc.) using MM02 (Change Material).
    2. Check Plant and Storage Location Settings:

      • Ensure that the material is extended to the plant and storage location where replenishment is taking place.
      • The MRP type is plant-specific, so it must be maintained for the relevant plant.
    3. Check WM Replenishment Configuration:

      • In some cases, the replenishment strategy or control parameters might require an MRP type.
      • Verify the replenishment control parameters in SPRO under: Logistics Execution -> Warehouse Management -> Strategies -> Replenishment -> Define Replenishment Control Parameters
      • Ensure that the system can determine the MRP type from the material master or replenishment control.
    4. Check if the Material is Relevant for MRP:

      • If the material is not relevant for MRP, the system might not have an MRP type.
      • You may need to adjust the replenishment strategy or make the material MRP relevant.
    5. Customizing for Replenishment:

      • Sometimes, the system expects an MRP type in the replenishment strategy.
      • Check if the replenishment strategy or movement type requires MRP type.
      • Adjust the configuration accordingly.

    Additional Information

    • MRP Type controls how the material is planned:
      • PD = MRP
      • VB = Manual reorder point planning
      • ND = No planning
    • If the material is not planned via MRP, replenishment might need to be handled differently.
    • The error can also occur if the system tries to create a replenishment request for a material that is not planned or has incomplete master data.
    • Always ensure master data consistency between MM and WM modules.

    Summary

    Aspect Details
    Error WT714: No MRP type was entered for replenishment
    Cause Material master missing MRP type or system cannot find MRP type during replenishment
    Solution Maintain MRP type in material master (MM02/MM03), check plant/storage location extension, verify replenishment config
    Related Areas Material Master (MRP 1 view), WM replenishment config, MRP planning

    If you need help with specific transaction codes or configuration paths, feel free to ask!

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages: