How To Fix WT216 - Forecast only possible if planning horizon is at least 2 days


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WT - Retail: Replenishment

  • Message number: 216

  • Message text: Forecast only possible if planning horizon is at least 2 days

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WT216 - Forecast only possible if planning horizon is at least 2 days ?

    Certainly! Here's a detailed explanation for the SAP error message WT216: "Forecast only possible if planning horizon is at least 2 days":


    Error Message:

    WT216 - Forecast only possible if planning horizon is at least 2 days


    Cause:

    This error occurs during the forecasting process in SAP when the planning horizon defined in the forecast parameters is set to less than 2 days. The system requires a minimum planning horizon of 2 days to perform a forecast because forecasting algorithms need a sufficient time frame to calculate meaningful predictions.

    • The planning horizon is the period for which the system considers data to generate the forecast.
    • If the planning horizon is too short (less than 2 days), the system cannot generate a forecast and throws this error.

    Where it occurs:

    • Typically during forecasting runs in SAP APO (Advanced Planning and Optimization) or SAP ERP when using the forecasting functions.
    • It can also appear in Material Requirements Planning (MRP) or Demand Planning when forecast parameters are incorrectly set.

    Solution:

    1. Increase the Planning Horizon:

      • Go to the forecast profile or planning parameters.
      • Set the planning horizon to at least 2 days or more.
      • This is usually done in the forecast profile settings or planning parameters in transaction codes like /SAPAPO/SDP94 (Demand Planning) or in the forecast profile maintenance.
    2. Check Forecast Profile Settings:

      • Verify the forecast profile assigned to the product/location.
      • Ensure that the planning horizon parameter is set correctly.
    3. Adjust Planning Horizon in Customizing:

      • In some cases, the planning horizon is defined in customizing or master data.
      • Adjust the settings to ensure the horizon is not less than 2 days.
    4. Review Master Data:

      • Check the product master or location master data for any settings that might restrict the planning horizon.

    Additional Information:

    • The minimum planning horizon of 2 days is a system requirement to ensure statistical relevance in forecasting.
    • If you need to forecast for a shorter period, consider adjusting your business process or forecasting approach.
    • This error helps prevent meaningless or inaccurate forecasts that could arise from too short a planning horizon.
    • Always ensure that the planning horizon aligns with your business needs and the nature of the product demand.

    Summary:

    Aspect Details
    Error Code WT216
    Message Forecast only possible if planning horizon is at least 2 days
    Cause Planning horizon set to less than 2 days
    Solution Increase planning horizon to 2 days or more
    Where to fix Forecast profile, planning parameters, master data

    If you need help navigating to the specific settings or transaction codes, please let me know!

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker