Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRPLCHK000 - Enter maximum number of processes to run for parallel processing


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRPLCHK - Retail: Replenishment

  • Message number: 000

  • Message text: Enter maximum number of processes to run for parallel processing

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRPLCHK000 - Enter maximum number of processes to run for parallel processing ?

    SAP Error Message:
    WRPLCHK000 Enter maximum number of processes to run for parallel processing


    Cause:

    This message appears when you are trying to execute a parallel processing job or report in SAP, but the system requires you to specify the maximum number of parallel processes (background jobs) that should run simultaneously. The system needs this input to manage resources and avoid overloading the system.

    Typically, this happens in scenarios such as:

    • Running reports or programs that support parallel processing (e.g., report variants, batch jobs).
    • When the program or job is designed to split the workload into multiple parallel processes.
    • The parameter for the maximum number of parallel processes has not been set or is missing.

    Solution:

    To resolve this message, you need to:

    1. Enter the maximum number of parallel processes when prompted by the system. This number defines how many parallel background processes will be started.

    2. Choose an appropriate number based on your system capacity and workload. For example:

      • If your system has multiple work processes available, you can enter a higher number.
      • If unsure, start with a small number (e.g., 2 or 3) and increase if needed.
    3. Check the program/job documentation to see if there is a recommended number of parallel processes.

    4. Adjust system parameters if necessary:

      • Ensure that the number of background work processes in your SAP system is sufficient to handle the parallel jobs.
      • You can check and adjust the number of background work processes in transaction RZ12.
    5. If the prompt appears unexpectedly:

      • Verify if the variant or job scheduling parameters are correctly maintained.
      • Check if the program or report has been customized or modified to require this input.

    Related Information:

    • Transaction Codes:

      • SM37 - Monitor background jobs.
      • SM50 / SM66 - Work process overview.
      • RZ12 - Configure background work processes.
      • The program or report you are running may have its own selection screen or variant where this parameter is set.
    • Parallel Processing in SAP:

      • SAP allows splitting large jobs into smaller parallel jobs to improve performance.
      • The maximum number of parallel processes controls how many jobs run simultaneously.
      • Overloading the system with too many parallel jobs can degrade performance.
    • Documentation:

      • Check the SAP program documentation or OSS notes related to the specific report or job you are running.
      • SAP Help Portal and SAP Notes may provide guidance on recommended parallel processing settings.

    Summary:

    • Cause: System requires you to specify the max number of parallel processes for a parallel job.
    • Solution: Enter an appropriate number of parallel processes when prompted.
    • Check: System capacity, background work processes, and program/job documentation.

    If you continue to face issues, consider consulting your SAP Basis team or checking SAP Notes for the specific program you are running.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker