How To Fix WRF_PRC_SCD443 - Date lead time or date follow-up time for date &1 will be modified


WRF_PRC_SCD443 - Overview

  • Message type: E = Error

  • Message class: WRF_PRC_SCD - Purchasing Scheduling Seasonal Procurement

  • Message number: 443

  • Message text: Date lead time or date follow-up time for date &1 will be modified

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_PRC_SCD443 - Date lead time or date follow-up time for date &1 will be modified ?
    The SAP error message WRF_PRC_SCD443 indicates that there is an issue with the date lead time or date follow-up time for a specific date in the system. This message typically arises in the context of supply chain management, particularly when dealing with planning and scheduling in SAP's Advanced Planning and Optimization (APO) module or similar functionalities.
    
    Cause: The error message is triggered when the system detects that the date lead time or follow-up time for a specific date (denoted as &1 in the message) is being modified. This can happen due to several reasons, including:
    Configuration Issues: The lead time or follow-up time settings in the material master or in the planning parameters may not be correctly configured. Data Inconsistencies: There may be inconsistencies in the data related to the planning or scheduling of materials, such as overlapping dates or incorrect time settings. Changes in Planning Parameters: If there have been recent changes to the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant