Do you have any question about this error?
Message type: E = Error
Message class: WRF_PRC_SCD - Purchasing Scheduling Seasonal Procurement
Message number: 438
Message text: Error in scheduling, date line cannot be calculated
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
WRF_PRC_SCD438
- Error in scheduling, date line cannot be calculated ?The SAP error message WRF_PRC_SCD438 indicates that there is an issue with scheduling in the system, specifically that the date line cannot be calculated. This error typically arises in the context of production planning and scheduling within the SAP system, particularly in the SAP Advanced Planning and Optimization (APO) module or in the SAP S/4HANA environment.
Causes:
Missing or Incorrect Master Data: The error may occur if there are missing or incorrect master data settings, such as:
- Material master data (e.g., lead times, production versions).
- Resource master data (e.g., capacity, availability).
- Work center settings.
Invalid Planning Parameters: If the planning parameters (like production lead times, transportation lead times, etc.) are not set correctly, it can lead to scheduling issues.
Calendar Settings: Issues with the factory calendar or holiday settings can prevent the system from calculating valid scheduling dates.
Capacity Constraints: If there are capacity constraints that prevent the scheduling of operations, this error may occur.
Date Calculation Logic: The logic used by the system to calculate dates may be encountering an unexpected condition, such as a negative time period or an invalid date range.
Solutions:
Check Master Data: Review the relevant master data for the materials and resources involved in the scheduling process. Ensure that all necessary fields are filled out correctly.
Review Planning Parameters: Verify that the planning parameters are set correctly in the system. This includes lead times, production versions, and any other relevant settings.
Examine Calendar Settings: Check the factory calendar and ensure that it is set up correctly. Make sure that there are no conflicting holiday settings that could affect scheduling.
Analyze Capacity: Look into the capacity of the work centers involved. Ensure that there is enough capacity available for the planned operations.
Debugging: If the issue persists, consider using debugging tools or transaction codes like
/n/SCMTMS/PRC
to analyze the scheduling process in detail.Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.
Contact SAP Support: If you are unable to resolve the issue, consider reaching out to SAP Support for assistance, providing them with the error message and any relevant details about the situation.
Related Information:
MD04
(Stock/Requirements List), MD01
(MRP Run), and CO01
(Create Production Order) to analyze the scheduling context.By following these steps, you should be able to identify the root cause of the WRF_PRC_SCD438 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
WRF_PRC_SCD437
Simplified date calculation carried out with planned delivery time
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WRF_PRC_SCD436
Dateline will be created with default planned delivery time of 99 days
What causes this issue? The planned delivery time does not exist.System Response The program uses the planned delivery time of 99 days, or you can m...
WRF_PRC_SCD439
Automatic date shift will be executed with an interval of zero days
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WRF_PRC_SCD440
The interval between 2 dates is greater than 999 days
What causes this issue? Date range not allowedSystem Response Date calculation is terminated.How to fix this error? Check the entered start dates, ...
Click on this link to search all SAP messages.