Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRF_PPW869 - No budgets exist for the selected materiasl


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_PPW - Price Planning Workbench

  • Message number: 869

  • Message text: No budgets exist for the selected materiasl

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_PPW869 - No budgets exist for the selected materiasl ?

    SAP Error Message:
    WRF_PPW869No budgets exist for the selected materials


    Cause:

    This error occurs when you attempt to perform a procurement or planning activity (such as creating a purchase requisition, purchase order, or planning run) for materials that do not have any budget assigned or available in the system. Essentially, the system checks the budget availability for the materials involved, and if no budget exists or the budget master data is missing for those materials, it throws this error.

    Common scenarios causing this error include:

    • Budget master data not maintained for the relevant cost centers or funds.
    • Budget periods not defined or budget amounts not entered for the materials or cost objects.
    • Incorrect assignment of materials to budget objects or controlling objects.
    • The budget check configuration is active, but the budget data is incomplete or missing.

    Solution:

    1. Check Budget Master Data:

      • Verify that budget master data exists for the relevant controlling objects (cost centers, internal orders, funds, etc.) linked to the materials.
      • Use transaction codes like FMBB (Budgeting), FMAVCR01 (Display Budget Availability Control), or FMEDDW (Budget Data Display) to check budget data.
    2. Maintain Budgets:

      • If budgets are missing, create or update the budget master data for the relevant fiscal year and controlling objects.
      • Ensure that the budget amounts are entered and released properly.
    3. Check Material Assignment:

      • Confirm that the materials are correctly assigned to the controlling objects or cost centers that have budgets.
      • Review the account assignment in the purchase requisition or order to ensure it points to the correct cost object.
    4. Review Budget Availability Control Settings:

      • Check the configuration of budget availability control in IMG under Controlling ? Funds Management ? Availability Control.
      • Ensure that the budget check is set up correctly and that the relevant tolerance limits and control indicators are properly configured.
    5. Re-run the Process:

      • After maintaining or correcting the budget data, retry the transaction that caused the error.

    Related Information:

    • Transaction Codes:

      • FMBB – Budgeting
      • FMAVCR01 – Display Budget Availability Control
      • FMEDDW – Budget Data Display
      • ME51N – Create Purchase Requisition (where error might occur)
      • ME21N – Create Purchase Order
    • SAP Notes:

      • Check SAP Notes related to budget availability control and error WRF_PPW869 for any patches or updates.
    • Configuration Path:

      • SPRO ? Controlling ? Funds Management ? Availability Control ? Define Availability Control
    • Additional Tips:

      • Coordinate with your Finance/Controlling team to ensure budgets are properly maintained.
      • If budget control is not required for certain materials or scenarios, consider adjusting the availability control settings accordingly.

    If you provide more context (e.g., transaction used, controlling area, material master data), I can help with more specific guidance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant