How To Fix WRF_DISPRO123 - Specify a value for planned delivery time.


WRF_DISPRO123 - Overview

  • Message type: E = Error

  • Message class: WRF_DISPRO -

  • Message number: 123

  • Message text: Specify a value for planned delivery time.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_DISPRO123 - Specify a value for planned delivery time. ?
    SAP Error Message:
    WRF_DISPRO123 - Specify a value for planned delivery time
    
    
    Cause: This error occurs during the production planning or material requirements planning (MRP) process when the system requires a planned delivery time for a material but finds that this value is missing or not maintained in the master data. The planned delivery time is a key parameter used in scheduling and planning to determine how long it takes for a material to be delivered or produced. Without this value, the system cannot correctly calculate the planned order start and finish dates. Where is the planned delivery time maintained? Material Master (MARC view): The planned delivery time is maintained in the MRP 1 view of the material master record. Field: Planned delivery time (in days) Purchasing Info Record: For externally procured materials, the planned delivery time can also be influenced by the purchasing info record. Source List or Vendor Master: Sometimes, the delivery time can be derived from the source list

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author