Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRF_DISPRO092 - Specify a time-dependent planned delivery time


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_DISPRO -

  • Message number: 092

  • Message text: Specify a time-dependent planned delivery time

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_DISPRO092 - Specify a time-dependent planned delivery time ?

    SAP Error Message:
    WRF_DISPRO092 - Specify a time-dependent planned delivery time


    Cause:

    This error occurs during the creation or processing of a production order or planned order in SAP when the system requires a time-dependent planned delivery time for a component or material, but this information is missing or not maintained.

    In other words, the system expects a planned delivery time that varies depending on the date or period (time-dependent), but it cannot find this data in the material master or related master data.


    Explanation:

    • Planned delivery time is the time required to procure or produce a component before it can be used in production.
    • In some scenarios, especially when using time-dependent procurement or planning, the planned delivery time can vary over different periods (e.g., due to seasonal supplier lead times, changing production schedules, or planned changes in procurement).
    • SAP expects this time-dependent planned delivery time to be maintained in the material master or in the relevant procurement info records.
    • If this data is missing, the system cannot calculate the correct scheduling dates and throws the error.

    Where to Check / Maintain:

    1. Material Master (MM02)

      • Go to the Purchasing view or MRP 2 view.
      • Check the Planned Delivery Time field.
      • If time-dependent planned delivery times are used, maintain them via the Time-Dependent Data button (usually available in the MRP views).
    2. Info Record (ME12)

      • Check if the planned delivery time is maintained in the purchasing info record for the vendor and material.
      • Time-dependent planned delivery times can also be maintained here.
    3. Source List (ME03)

      • Verify if the source list is maintained correctly for the material and vendor combination.
    4. Customizing Settings

      • Check if the system is configured to require time-dependent planned delivery times for certain materials or procurement types.
      • This can be influenced by settings in MRP or production scheduling.

    Solution:

    • Maintain the time-dependent planned delivery time for the material/component in the material master or purchasing info record.
    • If time-dependent data is not required, check if the system settings or master data incorrectly enforce this requirement and adjust accordingly.
    • After maintaining the planned delivery time, reprocess the order or planning run.

    Additional Notes:

    • This error is common in environments where lead times vary over time and are modeled accurately in SAP.
    • Ignoring or bypassing this can lead to incorrect scheduling and delays in production.
    • Always ensure that master data is consistent and complete for smooth MRP and production order processing.

    Summary:

    Aspect Details
    Cause Missing time-dependent planned delivery time for a material/component.
    Effect System cannot calculate scheduling dates, throws WRF_DISPRO092 error.
    Solution Maintain time-dependent planned delivery time in material master (MRP views) or info record.
    Transaction Codes MM02 (Material Master), ME12 (Info Record), ME03 (Source List)
    Related Areas MRP, Production Planning, Purchasing

    If you need help with the exact steps to maintain time-dependent planned delivery times, please let me know!

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant