How To Fix WRF_APC_INB122 - Conflict for material &1: Two items refer to date &2 (shifted from &3 &4)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_APC_INB - Messages for OAPC Inbound Processing

  • Message number: 122

  • Message text: Conflict for material &1: Two items refer to date &2 (shifted from &3 &4)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_APC_INB122 - Conflict for material &1: Two items refer to date &2 (shifted from &3 &4) ?

    Certainly! Here's a detailed explanation for the SAP error message:


    SAP Error Message:

    WRF_APC_INB122
    Text: Conflict for material &1: Two items refer to date &2 (shifted from &3 &4)


    Meaning / Cause:

    This error occurs in the Advanced Planning and Optimization (APO) module, specifically in the Demand Planning or Supply Network Planning area, when there is a conflict in the planning data for a material.

    • The system has detected that two different planning items (such as demand or supply elements) are referring to the same date (&2), but one of them was originally scheduled for a different date (&3 &4) and has been shifted.
    • This typically happens during the disaggregation or time bucket conversion process, where planning data is broken down from a higher-level time bucket (e.g., month) into lower-level time buckets (e.g., weeks or days).
    • The conflict means that the system cannot assign two separate planning elements to the same date for the same material without causing inconsistency or overlap.

    Common Causes:

    • Overlapping or duplicate planning elements for the same material and date.
    • Incorrect or inconsistent time bucket settings in planning versions or planning areas.
    • Errors in the disaggregation logic or rules that cause multiple items to be assigned to the same date.
    • Manual changes or incorrect master data that cause date conflicts.
    • Data inconsistencies after data transfer from ERP to APO or vice versa.

    Solution / How to Fix:

    1. Check Planning Data:

      • Review the planning data for the material mentioned (&1) around the conflicting date (&2).
      • Identify the two items that are causing the conflict.
    2. Analyze Time Buckets:

      • Verify the time bucket settings in the planning version and planning area.
      • Ensure that the disaggregation rules and time bucket conversions are correctly defined and consistent.
    3. Adjust Disaggregation Rules:

      • If disaggregation is causing the conflict, adjust the rules or parameters to avoid overlapping assignments.
      • For example, check the distribution keys or percentages used in disaggregation.
    4. Correct Master Data:

      • Check the master data for the material, such as product location master, resource master, or calendar settings.
      • Ensure that there are no inconsistencies that could cause date shifts.
    5. Data Consistency Checks:

      • Run consistency checks or data validation reports in APO to identify and fix data issues.
      • Use transaction /SAPAPO/SDP94 or /SAPAPO/SDP6 to analyze planning data.
    6. Re-run Planning:

      • After corrections, re-run the planning or disaggregation process to see if the conflict is resolved.
    7. Consult SAP Notes:

      • Check for any relevant SAP Notes that address this specific error message or related planning conflicts.

    Additional Information:

    • This error is specific to SAP APO (Advanced Planning and Optimization) and is related to the internal planning logic.
    • The placeholders in the message:
      • &1 = Material number
      • &2 = Date where conflict occurs
      • &3 &4 = Original date from which the item was shifted
    • Understanding the planning version, planning area, and time bucket configuration is crucial to resolving this issue.
    • If the problem persists, consider involving SAP APO support or consulting with an APO expert.

    If you provide the exact context (e.g., transaction, planning version, or process step), I can help you with more tailored troubleshooting steps.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.