Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRF_APC754 - External transportation chain changed / system recalculated the dateline


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_APC - Messages for Operational Assortment Planning and Control

  • Message number: 754

  • Message text: External transportation chain changed / system recalculated the dateline

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_APC754 - External transportation chain changed / system recalculated the dateline ?

    SAP Error Message:
    WRF_APC754 - External transportation chain changed / system recalculated the dateline


    Cause

    This message occurs in SAP Advanced Planning and Optimization (APO), specifically within the Supply Network Planning (SNP) or Production Planning and Detailed Scheduling (PP/DS) modules, when the system detects that the external transportation chain (i.e., the transportation lead times or routes defined outside the system or changed externally) has been modified. As a result, the system recalculates the dateline (the latest possible start date for production or procurement to meet a demand date) to reflect the updated transportation times.

    In other words, the transportation chain used for planning has changed (for example, due to changes in transit times, routes, or transportation modes), and the system automatically adjusts the dateline accordingly to ensure planning accuracy.


    Explanation

    • External transportation chain: This refers to transportation data maintained outside the internal planning logic, often imported or integrated from external systems or master data.
    • Dateline recalculation: The dateline is the critical date by which production or procurement must start to meet the demand date, considering all lead times including transportation. When transportation times change, the dateline must be recalculated to maintain feasible planning.

    Solution / How to Handle

    1. Review Transportation Chain Changes:
      Check the transportation lanes, lead times, and routes that have been changed or updated. Confirm that these changes are correct and intentional.

    2. Verify Master Data Consistency:
      Ensure that the transportation lanes and lead times in the system are consistent with the external data sources or agreements.

    3. Re-run Planning / SNP Heuristics:
      After confirming the transportation data, re-execute the planning run or heuristics to allow the system to recalculate the datelines and adjust planned orders accordingly.

    4. Communicate Changes:
      Inform relevant stakeholders (e.g., logistics, production planning) about the changes in transportation times and the impact on production or procurement schedules.

    5. Check Customizing Settings:
      If unexpected recalculations occur frequently, review the customizing settings for transportation lanes and dateline calculation in APO to ensure they align with business requirements.


    Related Information

    • Transaction Codes:

      • /SAPAPO/SDP94 - SNP Planning Book
      • /SAPAPO/PPDS - PP/DS Planning
      • /SAPAPO/MC90 - SNP Heuristic
    • Master Data:

      • Transportation Lanes (in APO)
      • Product Master Data (Lead Times)
      • Location Master Data
    • SAP Notes / Documentation:

      • SAP Help Portal on SNP and PP/DS transportation lead times and dateline calculation
      • SAP Notes related to WRF_APC754 (search in SAP ONE Support Launchpad)

    Summary

    The message WRF_APC754 is an informational warning indicating that the external transportation chain has changed, prompting the system to recalculate the dateline to maintain accurate planning. It is not an error that stops processing but a notification to review and confirm transportation data changes and their impact on planning schedules.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author