Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRF_APC033 - Planned material &1 is not assigned to hierarchy node &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_APC - Messages for Operational Assortment Planning and Control

  • Message number: 033

  • Message text: Planned material &1 is not assigned to hierarchy node &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_APC033 - Planned material &1 is not assigned to hierarchy node &2 ?

    Certainly! Here's a detailed explanation for the SAP error message:


    SAP Error Message:

    WRF_APC033 Planned material &1 is not assigned to hierarchy node &2


    Meaning / Cause:

    This error occurs in the context of SAP Advanced Planning and Optimization (APO), specifically within the Demand Planning or Supply Network Planning modules where planning hierarchies are used.

    • The message indicates that a planned material (material &1) is not assigned to the specified planning hierarchy node (&2).
    • In SAP APO, materials must be assigned to relevant nodes in the planning hierarchy to be included in planning runs or data aggregation.
    • If a material is missing from the hierarchy node, the system cannot process planning data for that material under the given node, hence the error.

    Common Causes:

    1. Material not assigned to the planning hierarchy node: The material master or product is not linked to the node in the planning hierarchy.
    2. Incorrect or incomplete master data setup: The planning hierarchy or product master data might be incomplete or inconsistent.
    3. Hierarchy node does not include the material: The node might be a higher-level node that does not cover the material in question.
    4. Data load or integration issues: If data is loaded from ERP or other systems, the assignment might not have been transferred correctly.

    Solution / How to Fix:

    1. Check Material Assignment:

      • Go to the planning hierarchy maintenance transaction (e.g., /SAPAPO/SDP94 or relevant transaction).
      • Verify if the material (&1) is assigned to the hierarchy node (&2).
      • If not assigned, assign the material to the correct node.
    2. Maintain Product Master Data:

      • Ensure that the product master data is correctly maintained in SAP APO.
      • Check if the product is active and correctly linked to the planning version and planning area.
    3. Review Planning Hierarchy:

      • Check the structure of the planning hierarchy to ensure that the node (&2) is the correct node for the material.
      • Adjust the hierarchy if necessary to include the material.
    4. Data Consistency Checks:

      • Run consistency checks or master data synchronization between ERP and APO.
      • Use transactions like /SAPAPO/MAT1 to check product master data.
      • Use /SAPAPO/SDP94 to maintain and check planning hierarchies.
    5. Re-import or Re-assign Data:

      • If the data was imported from ERP, consider re-importing or correcting the assignment in the source system.

    Additional Information:

    • This error is typical during planning runs, data aggregation, or when generating planning books and data views.
    • Proper assignment of materials to planning hierarchy nodes is crucial for accurate planning and reporting.
    • Documentation and training on planning hierarchy setup and product master data maintenance can help prevent this error.
    • If the problem persists, check SAP Notes or contact SAP Support for specific patches or fixes related to your SAP APO version.

    Summary:

    Aspect Details
    Error Message WRF_APC033 Planned material &1 is not assigned to hierarchy node &2
    Cause Material not assigned to the specified planning hierarchy node
    Solution Assign material to the hierarchy node; verify master data and hierarchy setup
    Transactions /SAPAPO/SDP94 (Planning Hierarchy), /SAPAPO/MAT1 (Product Master)
    Context SAP APO Demand Planning / Supply Network Planning

    If you need help with specific transaction steps or further troubleshooting, feel free to ask!

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author