Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WR059 - Gross or net revaluation balance missing for partial revaluation


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WR - Messages for Revaluation at Retail

  • Message number: 059

  • Message text: Gross or net revaluation balance missing for partial revaluation

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WR059 - Gross or net revaluation balance missing for partial revaluation ?

    Certainly! Here's a detailed explanation for the SAP error message WR059: Gross or net revaluation balance missing for partial revaluation.


    SAP Error Message WR059

    Message Text:
    Gross or net revaluation balance missing for partial revaluation


    Cause

    This error occurs during the asset revaluation process (usually in Asset Accounting, transaction codes like AR01, AR02, or during depreciation posting) when you attempt a partial revaluation of an asset, but the system cannot find the necessary gross or net revaluation balance for the asset in question.

    More specifically:

    • The system expects a revaluation balance (either gross or net) to be present for the asset to perform a partial revaluation.
    • If the asset has no existing revaluation balance or the balance is zero/missing, the system cannot calculate the partial revaluation.
    • This can happen if:
      • The asset was never revalued before (no prior revaluation balance).
      • The asset master data or asset ledger is inconsistent or incomplete.
      • The revaluation method or parameters are incorrectly set.
      • The asset is not flagged for revaluation or the revaluation area is not properly maintained.

    Solution

    To resolve the WR059 error, consider the following steps:

    1. Check Asset Master Data:

      • Verify that the asset is flagged for revaluation.
      • Check if the asset has a valid revaluation area and revaluation method assigned.
    2. Verify Existing Revaluation Balances:

      • Use transaction AR01 (Asset History Sheet) or AW01N (Asset Explorer) to check if the asset has any existing revaluation balances.
      • If no prior revaluation balance exists, you cannot perform a partial revaluation. You may need to perform a full revaluation first.
    3. Perform Full Revaluation First:

      • If this is the first revaluation for the asset, perform a full revaluation to establish the initial revaluation balance.
      • After the full revaluation, partial revaluations can be done.
    4. Check Revaluation Parameters:

      • Review the configuration in Asset Accounting Customizing (transaction SPRO ? Financial Accounting ? Asset Accounting ? Valuation ? Revaluation).
      • Ensure that the revaluation areas and methods are correctly set up.
    5. Check Document and Posting Data:

      • Sometimes, inconsistencies in posted documents or asset ledger entries cause this error.
      • Run reconciliation reports and correct any inconsistencies.
    6. Consult SAP Notes:

      • Check for any SAP Notes related to WR059 for your SAP version.
      • Sometimes, patches or corrections are available.

    Related Information

    • Transaction Codes:

      • AR01 - Asset History Sheet (to check balances)
      • AW01N - Asset Explorer (to view asset values and revaluation balances)
      • ABUMN - Transfer within company code (sometimes related to asset value changes)
      • AR02 - Change Asset Master Record (to check revaluation settings)
      • SPRO - Customizing for Asset Accounting
    • SAP Modules:

      • Asset Accounting (FI-AA)
      • Financial Accounting (FI)
    • Typical Scenario:

      • You try to post a partial revaluation (e.g., only part of the asset value is revalued).
      • The system expects a base revaluation balance to calculate the difference.
      • If missing, the system throws WR059.

    Summary

    Aspect Details
    Cause Missing gross or net revaluation balance for the asset during partial revaluation.
    Solution Ensure prior full revaluation exists; check asset master and revaluation settings; perform full revaluation if needed.
    Related Info Use AR01, AW01N to check balances; verify configuration in SPRO; check SAP Notes.

    If you provide more details about the transaction or scenario where the error occurs, I can help with more specific guidance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant