How To Fix WLC_PARALLEL050 - Job &1 was started in channel &2 with variant &3 (workload &4)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WLC_PARALLEL - Load Distribution and External Parallel Processing

  • Message number: 050

  • Message text: Job &1 was started in channel &2 with variant &3 (workload &4)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WLC_PARALLEL050 - Job &1 was started in channel &2 with variant &3 (workload &4) ?
    The SAP error message WLC_PARALLEL050 indicates that a job was started in a specific channel with a particular variant and workload. This message typically arises in the context of SAP's workload management and job scheduling features, particularly when dealing with parallel processing.
    
    Cause: The error message WLC_PARALLEL050 can occur due to several reasons, including: Job
    Configuration Issues: The job may not be configured correctly, or there may be issues with the variant or channel specified. Resource Constraints: The system may be experiencing resource constraints, such as insufficient background processing capacity or memory issues. Channel Limitations: The specified channel may have reached its limit for concurrent jobs, preventing new jobs from being started. Job Dependencies: There may be dependencies or prerequisites that have not been met for the job to run successfully. System Settings: The system settings for parallel processing may not be configured optimally, leading to conflicts or limitations.
    Solution: To resolve the WLC_PARALLEL050 error, consider the following steps: Check

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker