How To Fix WG110 - BOM explosion not possible for material &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WG - Messages for store order and investment buy

  • Message number: 110

  • Message text: BOM explosion not possible for material &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WG110 - BOM explosion not possible for material & ?

    Certainly! Here's a detailed explanation for the SAP error message WG110 - BOM explosion not possible for material &:


    Error Message

    WG110 - BOM explosion not possible for material &

    • The ampersand (&) is a placeholder for the material number in the actual message.

    Cause

    This error occurs when SAP cannot perform a BOM (Bill of Materials) explosion for the specified material. The BOM explosion is the process where SAP breaks down a material into its components based on the BOM structure.

    Common causes include:

    1. No BOM exists for the material
      The material does not have a BOM maintained in the system for the relevant plant or usage.

    2. Incorrect or missing BOM usage or status
      The BOM usage (e.g., production, costing) or status is not valid or not maintained.

    3. BOM is not valid for the plant or date
      The BOM might be created for a different plant or the validity dates do not cover the current date.

    4. Material master data issues
      The material may not be flagged as a configurable or production-relevant material, or the material type does not support BOM explosion.

    5. Authorization or system issues
      User may lack authorization to view or explode the BOM, or there could be system inconsistencies.


    Solution

    To resolve the error, check the following:

    1. Verify BOM existence

      • Use transaction CS03 (Display BOM) to check if a BOM exists for the material and plant.
      • If no BOM exists, create one using CS01.
    2. Check BOM usage and status

      • Ensure the BOM usage (e.g., 1 for production) is maintained and active.
      • Check BOM status and validity dates.
    3. Check plant and validity

      • Confirm the BOM is maintained for the correct plant.
      • Verify the BOM validity dates cover the date of explosion.
    4. Material master data

      • Check material master (MM03) for the material type and MRP type.
      • Ensure the material is flagged for production or relevant processes.
    5. Authorization

      • Verify user has the necessary authorizations to access BOM data.
    6. Recreate or update BOM

      • If BOM is corrupted or incomplete, recreate or update it.
    7. Check configuration

      • In some cases, check configuration settings related to BOM explosion in SPRO.

    Related Information

    • Transactions:

      • CS01 - Create BOM
      • CS02 - Change BOM
      • CS03 - Display BOM
      • CS11 - Display BOM explosion
      • CS12 - Multilevel BOM explosion
    • SAP Notes:

      • Check SAP Notes for any known bugs or patches related to BOM explosion.
    • BOM Explosion Process:

      • BOM explosion is used in production orders, MRP runs, costing, and other processes.
    • Material Master Views:

      • Ensure views like MRP1, MRP2, and Work Scheduling are properly maintained.

    If after these checks the problem persists, consider debugging the BOM explosion process or contacting SAP support with detailed logs.


    Summary:
    The error WG110 indicates SAP cannot find or use a BOM for the material in question. The solution is to verify and maintain the BOM correctly for the material, plant, and usage, ensuring all data and authorizations are in place.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author