How To Fix VW326 - Duration & contradicts duration between start and end


SAP Error Message - Details

  • Message type: E = Error

  • Message class: VW - Shipment Processing Output

  • Message number: 326

  • Message text: Duration & contradicts duration between start and end

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message VW326 - Duration & contradicts duration between start and end ?

    The SAP error message VW326, which states "Duration & contradicts duration between start and end," typically occurs in the context of project management or scheduling within SAP, particularly in modules like SAP Project System (PS) or SAP Controlling (CO). This error indicates that there is a mismatch between the defined duration of a task or activity and the actual start and end dates/times that have been specified.

    Cause:

    1. Inconsistent Dates: The start and end dates of a task or activity do not align with the defined duration. For example, if the start date is set to January 1 and the end date to January 5, but the duration is set to 10 days, this inconsistency will trigger the error.
    2. Incorrect Duration Calculation: The system may have calculated the duration incorrectly based on the calendar settings or working hours defined in the project.
    3. Changes in Dates: If the start or end dates were changed after the duration was set, it could lead to this error.
    4. Missing or Incorrect Calendar Settings: If the project or task is using a calendar that does not account for holidays or non-working days, it may lead to discrepancies in duration calculations.

    Solution:

    1. Check Dates and Duration: Review the start and end dates of the task or activity and ensure that they align with the defined duration. Adjust either the duration or the dates to resolve the conflict.
    2. Adjust Duration: If the duration is incorrect, modify it to match the actual time span between the start and end dates.
    3. Review Calendar Settings: Ensure that the correct calendar is assigned to the project or task and that it accurately reflects working days and holidays.
    4. Recalculate Duration: If applicable, use the system's functionality to recalculate the duration based on the current start and end dates.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing project durations and scheduling.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CJ20N (Project Builder) or CJI3 (Project Actual Line Items) to review and edit project details.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles: Ensure that you have the necessary permissions to make changes to project data, as restrictions may prevent you from resolving the issue.
    • Testing Changes: After making adjustments, test the changes in a development or test environment before applying them in production to avoid further issues.

    By following these steps, you should be able to resolve the VW326 error and ensure that your project scheduling is accurate.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker