Message type: E = Error
Message class: VO - W&S: Rough workload forecast + picking wave
Message number: 207
Message text: Warehouse &: no workload times maintained for process &
You have entered a document item that points to warehouse number &V1&
and causes the warehouse activity &V2& to be initiated.
The system should determine a processing time for this activity.
For this purpose it is necessary to maintain constant or variable
workload times for this warehouse number and for the
<DS:DE.ARBVG>warehouse activities</> assigned to this warehouse process.
However, this has not been done so far.
These workload times also depend on the <DS:DE.METYP>unit-of-measure
load category</> and the <DS:DE.LOGGR>logistics load category</>.
For the respective document item, the unit-of-measure load category &V3&
was derived from the unit of measure and the logistics load category
&V4& was derived from the material.
The processing time cannot be determined and is therefore not updated.
Maintain the workload times in Customizing for the rough workload foreca
st.
Error message extract from SAP system. Copyright SAP SE.
VO207
- Warehouse &: no workload times maintained for process & ?SAP Error Message:
VO207 Warehouse &: no workload times maintained for process &
Meaning / Cause
This error occurs in SAP Extended Warehouse Management (EWM) or Warehouse Management (WM) when the system tries to calculate or plan workload times for a specific warehouse and process, but it cannot find any workload time data maintained for that combination.
Workload times are essential for capacity planning, resource scheduling, and workload distribution in warehouse processes. If these times are not maintained, the system cannot estimate how long a process will take, leading to this error.
Workload times are typically maintained in the customizing settings for warehouse processes. In SAP EWM, this is done in the IMG under:
Or in older WM systems:
Check the Warehouse and Process:
Maintain Workload Times:
Verify Process Types:
Transport and Testing:
Aspect | Details |
---|---|
Cause | No workload times maintained for the specified warehouse and warehouse process. |
Effect | System cannot calculate workload or plan resources for the process, causing error VO207. |
Solution | Maintain workload times in SPRO for the warehouse and process causing the error. |
Transaction | SPRO ? EWM ? Cross-Process Settings ? Workload and Resource Management ? Define Workload Times |
If you need further help, please provide the warehouse number and process code, and I can guide you through the exact customizing steps.
Get instant SAP help. Sign up for our Free Essentials Plan.
VO206
Warehouse process &: no warehouse activities allocated
What causes this issue? You have entered a document item that initiates the execution of the warehouse process &V1&. A processing time should...
VO205
Table & is currently being processed by user &
What causes this issue? You wish to change the control data for updating the rough workload estimate / picking waves. Table &V1& is, howevere...
VO208
Exception MATERIAL_NOT_FOUND for material & has occurred
What causes this issue? Within the respective document, an item was entered that contains material &V1& and points to plant &V2&. For...