How To Fix VMP_MSG298 - You are not authorized to access Work Breakdown Structure BOM


VMP_MSG298 - Overview

  • Message type: E = Error

  • Message class: VMP_MSG - VMP Message Manager

  • Message number: 298

  • Message text: You are not authorized to access Work Breakdown Structure BOM

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message VMP_MSG298 - You are not authorized to access Work Breakdown Structure BOM ?
    SAP Error Message:
    VMP_MSG298 – "You are not authorized to access Work Breakdown Structure BOM"
    
    
    Cause: This error occurs because the user does not have the necessary authorization to access or modify the Work Breakdown Structure (WBS) Bill of Materials (BOM) in the Project System (PS) module. Specifically, the user lacks the required authorization objects or roles that control access to WBS BOM data. Explanation: The Work Breakdown Structure BOM is a special type of BOM linked to project elements in SAP PS. Access to WBS BOMs is controlled by specific authorization objects, such as: C_PROJECT (Project definition) C_BOM (Bill of Material) C_WBS (WBS element) If the user’s roles or profiles do not include these authorizations with the appropriate activity (e.g., display, change), the system will block access and show this error.
    Solution: Check User Authorizations: Verify the user’s roles and profiles in transaction SU01 or PFCG. Check if the user has the necessary authorizations for: Project System (PS) objects (C_PROJECT, C_WBS) BOM objects (C_BOM) Ensure the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker