Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: VMP_MSG - VMP Message Manager
Message number: 274
Message text: VSM launch not possible; planning scope has MBOM(s) in draft state
You tried to launch VSM for a planning scope, whose MBOM is in a draft
state. You cannot start planning unless the MBOM(s) are saved.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Save the MBOM(s) before you start planning.
Error message extract from SAP system. Copyright SAP SE.
VMP_MSG274
- VSM launch not possible; planning scope has MBOM(s) in draft state ?The SAP error message VMP_MSG274 indicates that the VSM (Value Stream Management) launch is not possible because the planning scope contains MBOMs (Manufacturing Bills of Materials) that are in a draft state. This typically occurs in environments where the planning and execution of manufacturing processes are tightly integrated with the use of MBOMs.
Cause:
The primary cause of this error is that the system is trying to initiate a VSM launch while there are MBOMs in a draft state within the specified planning scope. Draft MBOMs are not finalized and therefore cannot be used for planning or execution purposes. This can happen if:
- The MBOMs have been created but not yet released.
- There are changes made to the MBOMs that have not been saved or finalized.
- The planning scope is incorrectly defined, including draft MBOMs.
Solution:
To resolve this error, you need to ensure that all MBOMs within the planning scope are in a released state. Here are the steps you can take:
Check MBOM Status:
- Navigate to the MBOMs in question and check their status. You can do this through the SAP GUI by using transaction codes like
CS03
(Display BOM) orCS02
(Change BOM).Release Draft MBOMs:
- If you find any MBOMs in draft status, you will need to release them. This can typically be done by using transaction
CS02
to change the MBOM and then saving it in a released state.Review Planning Scope:
- Ensure that the planning scope you are using for the VSM launch does not include any draft MBOMs. You may need to adjust the planning scope to exclude these items.
Consult Documentation:
- Review any relevant SAP documentation or notes related to VSM and MBOMs to ensure that you are following best practices.
Testing:
- After making the necessary changes, attempt to launch the VSM again to see if the error persists.
Related Information:
By following these steps, you should be able to resolve the error and successfully launch the VSM.
Get instant SAP help. Sign up for our Free Essentials Plan.
VMP_MSG273
No engineering changes found on document version comparison
What causes this issue? You have compared two engineering versions of visuals having no change in the following: Addition of Visual items Deletion of...
VMP_MSG272
Drag and drop over an MBOM item is not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
VMP_MSG275
Item has been added in the current engineering version of the visual
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
VMP_MSG276
Item has been deleted in the current engineering version of the visual
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.