Message type: E = Error
Message class: VMP_MSG - VMP Message Manager
Message number: 199
Message text: Multiple activities in a network cannot share the same "Reference Point"
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
VMP_MSG199
- Multiple activities in a network cannot share the same "Reference Point" ?The SAP error message VMP_MSG199 indicates that there are multiple activities within a network that are trying to share the same "Reference Point." This typically occurs in the context of project management or network planning within SAP, where activities are defined and linked to specific reference points for scheduling and resource allocation.
Cause:
The error arises when:
- Duplicate Reference Points: Two or more activities in the same network are assigned the same reference point, which is not allowed as each reference point should uniquely identify a specific activity or task.
- Incorrect Network Configuration: The network structure may not be set up correctly, leading to conflicts in reference point assignments.
- Data Entry Errors: Manual entry errors during the creation or modification of activities can lead to unintentional duplication of reference points.
Solution:
To resolve the error, you can take the following steps:
Identify Duplicate Activities:
- Review the activities in the network to identify which ones are using the same reference point.
- You can do this by checking the activity details in the network structure.
Modify Reference Points:
- Change the reference point for one or more of the conflicting activities to ensure that each activity has a unique reference point.
- This can typically be done in the activity details screen where you can edit the reference point field.
Check Network Configuration:
- Ensure that the network is configured correctly and that there are no logical errors in the way activities are linked or structured.
- If necessary, consult with a project manager or SAP consultant to review the network design.
Data Validation:
- Implement data validation checks to prevent future occurrences of this error. This can include setting up rules or guidelines for entering reference points.
Testing:
- After making changes, test the network to ensure that the error no longer occurs and that the activities are functioning as expected.
Related Information:
CJ20N
(Project Builder) or CN41
(Network Overview) to navigate and manage project networks effectively.By following these steps, you should be able to resolve the VMP_MSG199 error and ensure that your network activities are correctly configured.
Get instant SAP help. Sign up for our Free Essentials Plan.
VMP_MSG198
No BOM will be created for material &1
What causes this issue? You created an MBOM having assemblies with no components in the planned panel.System Response The system issues an error mes...
VMP_MSG197
Invalid product variant; no material assigned
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
VMP_MSG200
Activity is completed; no assignment possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
VMP_MSG201
Planning scope alternatives exist for material &1
What causes this issue? You started to plan for a material having no planned BOMs.System Response The system issues an error message and will not al...
Click on this link to search all SAP messages.