How To Fix VMP_MSG092 - Selected MBOM(s) removed from planning scope alternative


VMP_MSG092 - Overview

  • Message type: E = Error

  • Message class: VMP_MSG - VMP Message Manager

  • Message number: 092

  • Message text: Selected MBOM(s) removed from planning scope alternative

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message VMP_MSG092 - Selected MBOM(s) removed from planning scope alternative ?
    The SAP error message VMP_MSG092 indicates that selected Manufacturing Bill of Materials (MBOMs) have been removed from the planning scope alternative. This typically occurs in the context of production planning and can be related to various factors. Here’s a breakdown of the potential causes, solutions, and related information:
    Causes:
    
    Planning Scope Configuration: The planning scope alternative may not include the selected MBOMs due to configuration settings.
    Material Status: The materials associated with the MBOMs may have a status that prevents them from being included in planning (e.g., blocked, inactive).
    Versioning Issues: The MBOMs may have different versions, and the version being referenced may not be valid or active.
    Dependencies and Relationships: There may be dependencies or relationships that prevent the MBOMs from being included in the planning scope.
    Master Data Issues: Incomplete or incorrect master data for the materials or BOMs can lead to this error.
    
    Solutions:
    
    
    Check Planning Scope Configuration:
    
    Review the planning scope settings in the relevant

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author