How To Fix VCH_HL_SRV_BOM010 - No explosion date has been supplied for BOM explosion


VCH_HL_SRV_BOM010 - Overview

  • Message type: E = Error

  • Message class: VCH_HL_SRV_BOM - Exception messages for BOM Explosion

  • Message number: 010

  • Message text: No explosion date has been supplied for BOM explosion

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message VCH_HL_SRV_BOM010 - No explosion date has been supplied for BOM explosion ?
    The SAP error message VCH_HL_SRV_BOM010 indicates that there is no explosion date provided for the Bill of Materials (BOM) explosion process. This error typically occurs when trying to perform operations that require the system to explode a BOM, such as in production planning or material requirements planning (MRP).
    
    Cause: The primary cause of this error is the absence of an explosion date in the transaction or function call that is attempting to perform the BOM explosion. The explosion date is crucial because it determines the time frame for which the BOM should be evaluated, including the components and their quantities.
    Solution: To resolve this error, you can take the following steps: Provide an Explosion Date: Ensure that you are supplying a valid explosion date in the relevant transaction or function. This date should be a date when the BOM is to be exploded, typically the planned production date or the date of the order. Check Configuration: Verify the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author