How To Fix VC244 - The rule for the contract start date refers to the contract start date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: VC - SD Customizing

  • Message number: 244

  • Message text: The rule for the contract start date refers to the contract start date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message VC244 - The rule for the contract start date refers to the contract start date ?
    The SAP error message VC244 indicates that there is a circular reference in the rules defined for the contract start date in the context of variant configuration. This typically occurs when the rules set for determining the contract start date inadvertently refer back to the contract start date itself, creating a loop that the system cannot resolve.
    
    Cause: Circular Reference: The most common cause of this error is that the rules defined for the contract start date are incorrectly set up to reference the contract start date itself, leading to a circular dependency. Incorrect Rule Logic: The logic in the configuration rules may not be properly defined, causing the system to misinterpret the dependencies. Missing or Incorrect Dependencies: There may be missing dependencies or incorrect conditions that lead to the system being unable to determine a valid contract start date.
    Solution: Review Rules: Check the rules defined for the contract start date in the configuration settings.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker