Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: VAL - Treasury: Messages for General Valuation
Message number: 202
Message text: NPV on &2 for contract &1 has no currency
At &V2&, you defined a present value for contract &V1& in the system.
However, you did not enter a currency for this present value.
The activity is terminated.
Maintain the currency.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
VAL202
- NPV on &2 for contract &1 has no currency ?The SAP error message VAL202 indicates that there is an issue with the currency assignment for a contract in the system. Specifically, the message states that the contract (identified by &1) does not have a currency assigned to it, which is necessary for processing valuation or financial transactions.
Cause:
- Missing Currency Assignment: The contract does not have a currency defined in its master data. This can happen if the contract was created without specifying a currency or if the currency was inadvertently removed.
- Data Migration Issues: If data was migrated from another system or if there were changes made to the contract data, it might have resulted in the loss of currency information.
- Configuration Issues: There may be configuration settings in the SAP system that are not correctly set up, leading to the inability to assign a currency to contracts.
Solution:
Check Contract Master Data:
- Navigate to the contract in question (using transaction codes like ME33K for purchasing contracts or similar for other types).
- Verify if the currency field is populated. If it is empty, you will need to update the contract to include the appropriate currency.
Update Currency:
- If the currency is missing, you can edit the contract and assign the correct currency. Make sure to save the changes.
Review Data Migration:
- If the issue arose after a data migration, review the migration process to ensure that currency data was included and correctly mapped.
Check Configuration:
- Consult with your SAP configuration team to ensure that the settings related to currency assignment for contracts are correctly configured.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on handling contract currencies and related settings.
Related Information:
If the problem persists after following these steps, it may be beneficial to reach out to your SAP support team for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
VAL201
For security ID &1, cannot determine price with price type &3 on &2
What causes this issue? For the security with ID &V1& up to &V2&, the system has no rate with rate type &V3& and exchange &am...
VAL200
*** Valuation step rate valuation *** (201-299)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
VAL203
For contract &1 at &2, no NPV can be determined with NPV category &3
What causes this issue? You wish to execute a rate valuation for a loan position. However, no NPV with NPV category &V3& exists in the system...
VAL204
No NPV with NPV category &3 can be determined for trans. &1 on &2
What causes this issue? No NPV for the transaction.System Response The system displays and error, while saving the business transaction (designation...
Click on this link to search all SAP messages.