Do you have any question about this error?
Message type: E = Error
Message class: V50R - Extended Collective Processing for Delivery Creation
Message number: 009
Message text: Parallel processing of delivery creation started
In addition to the system task that is being processed in your current
transaction, at least one other system task for creation of deliveries
was started in the background.
The system creates deliveries in the background and records them and any
problems that occur in the collective processing log.
This way, you regain control of processing in the delivery list quicker.
If more processes than allowed are necessary, the current foreground
task is used sequentially.
Continue processing the delivery list. Make sure that documents are not
accidentally delivered more than once.
The number of tasks that can be started in addition to the current
transaction (creating deliveries in the background) can be set in the
delivery creation profile by using <ds:tran.VL10CU_ALL>Customizing</>
for list profiles.
If you enter 0 as an amount, parallel processing is deactivated.
Error message extract from SAP system. Copyright SAP SE.
V50R009
- Parallel processing of delivery creation started ?The SAP error message V50R009 indicates that parallel processing of delivery creation has started, which is typically not an error in itself but rather an informational message. This message is often seen in the context of the delivery creation process in SAP, particularly when using the transaction for creating deliveries from sales orders.
Cause:
- Parallel Processing: The message indicates that the system is attempting to create deliveries in parallel to improve performance. This is common in environments with a high volume of sales orders.
- Configuration Settings: The system may be configured to allow parallel processing for delivery creation, which can lead to this message being displayed.
- System Load: High system load or a large number of sales orders can trigger parallel processing as the system tries to optimize resource usage.
Solution:
- Monitor the Process: If you see this message, it is advisable to monitor the delivery creation process to ensure that it completes successfully. Check the status of the deliveries being created.
- Check Logs: Review the application logs or the job logs to see if there are any errors or warnings related to the delivery creation process.
- Adjust Configuration: If parallel processing is causing issues (e.g., performance degradation or conflicts), consider adjusting the configuration settings related to parallel processing in the SAP system.
- Performance Tuning: If the system is frequently overloaded, consider performance tuning measures, such as optimizing database performance, increasing system resources, or scheduling delivery creation during off-peak hours.
Related Information:
If the message is accompanied by actual errors or if deliveries are not being created as expected, further investigation may be required to identify the root cause and resolve any underlying issues.
Get instant SAP help. Sign up for our Free Essentials Plan.
V50R008
Delivery not possible at the moment
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
V50R007
No authorization to create deliveries for shipping point &1
What causes this issue? You do not have authorization to create deliveries for shipping point &v1&. The system issues an error message and wi...
V50R010
'Processing delivery due list' moved in Release 4.6 (see long text)
What causes this issue? As of Release 4.6, transactions <ds:tran.VL10>VL10</>, <ds:tran.VL10A>VL10A</>, <ds:tran.VL10B>...
V50R011
Delivery scenario &1 missing (see long text)
What causes this issue? The client-dependent settings for delivery scenario &v1& are missing in Customizing. System Response The delivery s...
Click on this link to search all SAP messages.