Message type: E = Error
Message class: V4 - Nachrichten Verkauf (Variable Meldungen und EDI-Meldungen)
Message number: 131
Message text: Requested dlv. date cannot be met for sched. line(s) &2 &3 in item &1
The requested delivery date for one or more delivery-relevant schedule
lines for item &V1& could not be met as a result of the
<DS:GLOS.availability_check>availability check</> (if activated) and
<DS:GLOS.delivery_scheduling>delivery scheduling</>.
Check whether the customer agrees to the redetermined confirmed
quantities and dates. If not, take the appropriate measures.
Error message extract from SAP system. Copyright SAP SE.
V4131
- Requested dlv. date cannot be met for sched. line(s) &2 &3 in item &1 ?The SAP error message V4131 indicates that the requested delivery date for a scheduling line cannot be met. This typically occurs in the context of sales and distribution (SD) when there are issues with the availability of materials or scheduling conflicts.
Cause:
- Material Availability: The requested delivery date cannot be met due to insufficient stock or materials not being available for production.
- Production Constraints: If the item is produced internally, there may be production scheduling issues or constraints that prevent meeting the requested date.
- Lead Times: The lead times defined in the system for procurement or production may not allow for the requested delivery date to be met.
- Transportation Issues: There may be transportation constraints or delays that affect the ability to deliver on the requested date.
- Configuration Issues: Incorrect configuration in the material master or sales order may lead to unrealistic delivery dates being set.
Solution:
- Check Material Availability: Use transaction code MD04 (Stock/Requirements List) to check the availability of the material. If stock is insufficient, consider adjusting the stock levels or changing the delivery date.
- Adjust Delivery Date: If the requested delivery date is not feasible, consider changing it to a later date that can be met based on current stock and production schedules.
- Review Production Schedule: If the item is produced, check the production schedule and lead times. Adjust production planning if necessary.
- Check Transportation: Ensure that transportation planning is aligned with the delivery requirements. Adjust transportation schedules if needed.
- Configuration Review: Review the configuration settings in the material master and sales order to ensure that lead times and availability checks are set correctly.
- Consult with Planning Team: If the issue persists, consult with the planning or logistics team to identify any underlying issues that may be affecting delivery capabilities.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
V4130
No del. sched. exists for this item
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
V4129
No JIT del. sched. exists for this item
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
V4132
There is no active JIT schedule line for the item
What causes this issue? You have entered the MRP planning indicator <LB>E</> (forecast delivery schedules only). If there are still activ...
V4133
Quantity comparison: Error in date determination
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...