How To Fix V1691 - 'Referencing procedure' is only relevant for master contracts


V1691 - Overview

  • Message type: E = Error

  • Message class: V1 - Verkaufsbelegbearbeitung

  • Message number: 691

  • Message text: 'Referencing procedure' is only relevant for master contracts

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message V1691 - 'Referencing procedure' is only relevant for master contracts ?
    The SAP error message V1691, which states that "'Referencing procedure' is only relevant for master contracts," typically occurs in the context of contract management within the SAP system, particularly when dealing with contract types that are not set up to support referencing procedures.
    
    Cause: The error arises when you attempt to use a referencing procedure in a contract that is not classified as a master contract. In SAP, master contracts are used to manage multiple related contracts, and referencing procedures are designed to link these contracts together. If you try to apply a referencing procedure to a standard contract or a contract type that does not support this feature, you will encounter this error.
    Solution: To resolve the V1691 error, consider the following steps: Check Contract Type: Ensure that the contract you are working with is indeed a master contract. If it is not, you will need to either create a master contract or adjust

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant