Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: UPWB - Messages for Development Class UPWB
Message number: 059
Message text: First define the planning area and the planning level
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
UPWB059
- First define the planning area and the planning level ?The SAP error message UPWB059, which states "First define the planning area and the planning level," typically occurs in the context of SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO). This error indicates that the system requires you to define a planning area and a planning level before you can proceed with certain planning activities.
Cause:
- Missing Configuration: The planning area and planning level have not been defined in the system. This is a prerequisite for many planning functions in SAP IBP/APO.
- Incorrect Settings: The settings for the planning area or planning level may be incomplete or incorrect.
- User Role/Authorization Issues: The user may not have the necessary permissions to access or define the planning area and level.
Solution:
Define Planning Area:
- Navigate to the relevant configuration transaction in SAP (e.g.,
/SAPAPO/MC90
for APO).- Create a new planning area by specifying the necessary parameters such as the planning type, key figures, and other relevant settings.
- Ensure that the planning area is activated.
Define Planning Level:
- After defining the planning area, you need to create a planning level.
- This can typically be done in the same configuration area where you defined the planning area.
- Specify the characteristics that will be used for the planning level (e.g., product, location, time).
Check Authorizations:
- Ensure that the user has the necessary authorizations to create and modify planning areas and levels.
- If needed, consult with your SAP security team to verify and adjust user roles.
Consult Documentation:
- Refer to the SAP Help documentation for detailed steps on defining planning areas and levels specific to your version of SAP IBP or APO.
Testing:
- After defining the planning area and level, test the configuration by attempting to perform the planning activity again to ensure that the error is resolved.
Related Information:
By following these steps, you should be able to resolve the UPWB059 error and proceed with your planning activities in SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
UPWB058
Web interface &1 is opened in display mode
What causes this issue? You attempted to open the Web interface for editing. However, the Web Interface Builder automatically switched into the displ...
UPWB057
First determine the planning area
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
UPWB060
Selector &1 cannot be referenced by components of different types
What causes this issue? A selector can simultaneously be used either by several components of the type planning layout or by several components of th...
UPWB061
Selector is referenced; Planning level cannot be set
What causes this issue? You cannot set the property "planning level" of a selector explicitly if the selector is already referenced by othe...
Click on this link to search all SAP messages.