Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: UPS1 - SEM-BPS Status and Tracking System Messages
Message number: 151
Message text: Subplans &1 and &2 have &3 common nodes
Hierarchies for subplans &V1& and &V2& have &V3& common nodes.
You can find more information on the subobjects that have been copied
under the following log entries:
Planning layout and control report URLs/ links
Planning sequences/ events at status change.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
UPS1151
- Subplans &1 and &2 have &3 common nodes ?The SAP error message UPS1151 indicates that there is a conflict in the configuration of subplans within a project or process. Specifically, it states that two subplans (identified as &1 and &2) share a certain number of common nodes (indicated by &3). This can occur in various contexts, such as project management, production planning, or other areas where subplans are utilized.
Cause:
The error typically arises when:
- Overlapping Nodes: The two subplans have been defined in such a way that they include the same nodes or activities, which can lead to ambiguity in execution or reporting.
- Configuration Issues: There may be a misconfiguration in the way the subplans are set up, leading to unintended overlaps.
- Data Integrity Issues: There could be issues with the data integrity in the system, where nodes are incorrectly assigned to multiple subplans.
Solution:
To resolve the UPS1151 error, you can take the following steps:
Review Subplan Definitions: Check the definitions of the subplans &1 and &2 to identify the common nodes. You can do this by navigating to the relevant configuration or planning transaction in SAP.
Modify Subplans: If the common nodes are not intended to overlap, modify one or both of the subplans to eliminate the shared nodes. This may involve:
- Removing nodes from one of the subplans.
- Reassigning nodes to different subplans if they are meant to be exclusive.
Consult Documentation: Refer to SAP documentation or guidelines related to the specific module you are working with (e.g., Project System, Production Planning) for best practices on defining subplans.
Data Consistency Check: Run a data consistency check to ensure that there are no other underlying issues causing the overlap. This may involve checking for orphaned nodes or incorrect assignments.
Testing: After making changes, test the configuration to ensure that the error is resolved and that the subplans function as intended.
Seek Help: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance.
Related Information:
By following these steps, you should be able to identify the cause of the UPS1151 error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
UPS1150
Subplans &1 and &2 have no common node intersections
What causes this issue? Hierarchies for subplans &V1& and &V2& have no common intersection of nodes. For this reason, no entries were...
UPS1142
Delete: &1: No entries were found for the selection
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
UPS1160
Errors occurred during deletion: A rollback was performed
What causes this issue? At least one error occurred while attempting to delete data. The system has performed a database rollback. No data was delete...
UPS1161
Errors occurred during copying: A rollback was performed
What causes this issue? At least one error occurred while attempting to delete or insert data. The system has performed a database rollback. No data ...
Click on this link to search all SAP messages.