Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix UPP_PP_K040 - Subhierarchy in the selection does not only have chargeable nodes


SAP Error Message - Details

  • Message type: E = Error

  • Message class: UPP_PP_K - Messages for Planning Processor Core

  • Message number: 040

  • Message text: Subhierarchy in the selection does not only have chargeable nodes

  • Show details Hide details
  • What causes this issue?

    In the selection (planning level or planning package), you have defined
    a part of hierarchy '&V1&' with the nodes '&V2&'. This subhierarchy
    contains chargeable nodes and also text nodes or nodes on anther
    characteristic than the hierarchy-bearing characteristic. Furthermore,
    this subhierarchy is also displayed in the planning layout.
    If in manual planung a subhierarchy with postable nodes is used, then
    postable nodes are ready for input (with the exception of root nodes);
    manual planning then switches to a special processing mode. The other
    node types (text nodes, nodes on another characteristic) are not
    allowed in this mode, because they are never ready for input. The
    current set up subhierarchies contain such unallowed nodes
    You can find further information on this topic under:
    <DS:DE.UPP_Y_BUDGET_HIE>BW hierarchy with postable nodes</>

    System Response

    Planning cannot be executed with this subhierarchy.,,,,,,

    How to fix this error?

    If you use a subhierarchy with postable nodes, then with exception of
    the root node the selected subhierarchy of every node which has lower-
    level elements, must be postable. This condition is then filled when
    the entire hierarchy only contains postable nodes.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message UPP_PP_K040 - Subhierarchy in the selection does not only have chargeable nodes ?

    The SAP error message UPP_PP_K040 indicates that there is an issue with the selection of nodes in a subhierarchy that is being processed in the context of a planning application, typically related to the SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO) modules. The specific message "Subhierarchy in the selection does not only have chargeable nodes" suggests that the selected nodes include non-chargeable nodes, which are not valid for the operation you are trying to perform.

    Cause:

    1. Non-Chargeable Nodes: The subhierarchy you are trying to work with includes nodes that are not chargeable. Chargeable nodes are typically those that can incur costs or revenues, while non-chargeable nodes may represent aggregations or categories that do not directly contribute to financial calculations.
    2. Hierarchy Structure: The structure of the hierarchy may not be set up correctly, leading to the inclusion of non-chargeable nodes in your selection.
    3. Selection Criteria: The criteria used to select nodes may not be filtering out non-chargeable nodes effectively.

    Solution:

    1. Review the Hierarchy: Check the hierarchy structure to ensure that only chargeable nodes are included in the selection. You may need to adjust the hierarchy or the way nodes are categorized.
    2. Adjust Selection Criteria: Modify the selection criteria to ensure that only chargeable nodes are selected. This may involve using filters or conditions that specifically exclude non-chargeable nodes.
    3. Consult Documentation: Refer to SAP documentation or help resources for guidance on how to properly configure hierarchies and selections in your specific planning application.
    4. Data Validation: Validate the data in your planning model to ensure that all nodes are correctly classified as chargeable or non-chargeable.
    5. Contact Support: If the issue persists, consider reaching out to SAP support or your internal SAP team for further assistance.

    Related Information:

    • Chargeable vs. Non-Chargeable Nodes: Understanding the difference between these types of nodes is crucial for effective planning and reporting.
    • Hierarchy Configuration: Familiarize yourself with how hierarchies are set up in your SAP system, including how to define chargeable nodes.
    • SAP Community: Engage with the SAP Community forums for insights and solutions from other users who may have encountered similar issues.
    • Training and Documentation: Consider training sessions or reviewing documentation related to SAP IBP or APO to better understand the planning processes and hierarchy management.

    By addressing the root cause of the error and ensuring that your selections are correctly configured, you should be able to resolve the UPP_PP_K040 error message.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant