How To Fix UPE1031 - The specified planning level &1 (&2) is not consistent


UPE1031 - Overview

  • Message type: E = Error

  • Message class: UPE1 - Messages: Link to External Applications

  • Message number: 031

  • Message text: The specified planning level &1 (&2) is not consistent

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message UPE1031 - The specified planning level &1 (&2) is not consistent ?
    The SAP error message UPE1031 indicates that there is an inconsistency with the specified planning level in the context of planning or budgeting processes. This error typically arises in SAP systems that utilize the SAP Integrated Business Planning (IBP) or SAP Business Planning and Consolidation (BPC) modules.
    
    Cause: The error message UPE1031 can be triggered by several factors, including: Inconsistent Planning Levels: The planning level specified in the transaction or report does not match the expected structure or hierarchy defined in the system. This could be due to changes in the planning model or data structure. Missing Master Data: The required master data for the specified planning level may be missing or not properly maintained. This can include dimensions, attributes, or key figures that are essential for the planning process. Incorrect Configuration: The configuration settings for the planning area or planning model may not be set up correctly, leading to inconsistencies in how data is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant