Message type: E = Error
Message class: UPB_CW - Cost Center Wizard
Message number: 082
Message text: Planning sequence &1 does not exist
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
UPB_CW082
- Planning sequence &1 does not exist ?The SAP error message UPB_CW082, which states "Planning sequence &1 does not exist," typically occurs in the context of SAP Business Planning and Consolidation (BPC) or SAP Integrated Business Planning (IBP). This error indicates that the system is unable to find a specified planning sequence that is required for executing a planning function or process.
Cause: Non-Existent Planning Sequence: The planning sequence referenced in the error message does not exist in the system. This could be due to a typo in the sequence name or the sequence not being created or activated. Authorization Issues: The user may not have the necessary authorizations to access the planning sequence.
Configuration Issues: The planning sequence may not have been properly configured or may have been deleted or deactivated. Transport Issues: If the planning sequence was recently transported from another system (e.g., from development to production), it may not have been included in the transport request.
Solution: Verify Planning Sequence: Check
Get instant SAP help. Sign up for our Free Essentials Plan.
UPB_CW081
Method &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
UPB_CW080
Global sequence &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
UPB_CW083
Layout &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
UPB_CW084
Parameter group &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.