Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: UPB_CCP - SEM Cost Center Planning: Messages
Message number: 012
Message text: Selected master cost center does not contain any data
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
UPB_CCP012
- Selected master cost center does not contain any data ?The SAP error message UPB_CCP012 indicates that the selected master cost center does not contain any data. This error typically occurs in the context of planning or budgeting processes within SAP, particularly when using the SAP Business Planning and Consolidation (BPC) or SAP Integrated Business Planning (IBP) modules.
Cause:
No Data in Cost Center: The most common cause of this error is that the selected cost center has not been populated with any planning data or actual data. This could be due to:
- The cost center has just been created and has not yet been assigned any budget or actual costs.
- Data has been deleted or not yet uploaded for the cost center.
- The cost center is not active or is in a status that does not allow data entry.
Incorrect Selection: The user may have selected a cost center that is not relevant for the current planning period or scenario.
Authorization Issues: The user may not have the necessary authorizations to view or access data for the selected cost center.
Solution:
Check Data Entry: Verify if there is any data entered for the selected cost center. You can do this by:
- Navigating to the cost center in the relevant SAP module (e.g., controlling or finance) and checking if any planning or actual data exists.
- If no data exists, you may need to enter the required data for the cost center.
Review Cost Center Configuration: Ensure that the cost center is properly configured and active. Check the following:
- The cost center is assigned to the correct controlling area.
- The cost center is active for the relevant planning period.
Select the Correct Cost Center: Make sure that you are selecting the correct cost center that is relevant for your planning scenario. Double-check the cost center hierarchy and ensure you are not selecting a cost center that is not intended for use.
Authorization Check: Ensure that you have the necessary authorizations to access the data for the selected cost center. If you suspect authorization issues, contact your SAP security administrator.
Data Upload: If you are working with a planning application, ensure that any necessary data uploads have been completed. This may involve running data loads or ensuring that data is transferred from other systems.
Related Information:
KS03
(Display Cost Center) or KP06
(Change Plan Data) to check the status and data of the cost center.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in SAP Controlling (CO) or SAP BPC/IBP.
Get instant SAP help. Sign up for our Free Essentials Plan.
UPB_CCP011
Selected master cost center must be in the current group
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
UPB_CCP010
A cost center must be selected in the planning package
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
UPB_CCP013
This version contains no data. Copy master version &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
UPB_CCP015
Data was saved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.