Message type: E = Error
Message class: UPB_CCP - SEM Cost Center Planning: Messages
Message number: 009
Message text: Incorrect value for variable &1
Variable &V1& should be replaced by a value. The value to be replaced
must concern a single value in the current context. However, an
interval or a list of single values was entered in the variable
definition.
Action was canceled.
Change the variable definition in the planning area used for cost
center planning so that only a single value can be set in the program.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
UPB_CCP009
- Incorrect value for variable &1 ?The SAP error message UPB_CCP009, which states "Incorrect value for variable &1," typically occurs in the context of SAP Business Planning and Consolidation (BPC) or SAP Integrated Business Planning (IBP) when a variable used in a planning function or a data input is not valid or does not meet the expected criteria.
Cause: Invalid Variable Value: The variable specified in the error message (&1) has been assigned a value that is not acceptable. This could be due to: The value being outside the allowed range. The value not existing in the master data. The variable being incorrectly defined in the planning function or data model. Data Type Mismatch: The variable may have a data type that does not match the expected type (e.g., a string value where a numeric value is expected). Missing Master Data: The variable might refer to a master data element that is not available or has not been loaded into the system.
Configuration Issues:
Get instant SAP help. Sign up for our Free Essentials Plan.
UPB_CCP008
This version cannot be selected
What causes this issue? This version cannot be selected, or the master version is not correctly defined in the table UPB_CCP_CUST.System Response Th...
UPB_CCP007
Program does not recognize variable &1
What causes this issue? You assigned a delivered function module of the planning application "cost center planning" to variable &V1&...
UPB_CCP010
A cost center must be selected in the planning package
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
UPB_CCP011
Selected master cost center must be in the current group
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...