Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: UMB - SEM-CPM: Balanced Scorecard
Message number: 050
Message text: Duration is longer than 10 years
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
UMB050
- Duration is longer than 10 years ?The SAP error message UMB050, which states "Duration is longer than 10 years," typically occurs in the context of project management or planning within SAP systems, particularly when dealing with project definitions, scheduling, or resource planning. This error indicates that the duration specified for a project or task exceeds the maximum allowable limit of 10 years.
Cause:
- Excessive Duration Input: The most common cause is that the user has inadvertently entered a duration that exceeds 10 years (e.g., 11 years, 15 years, etc.) in the project or task definition.
- Incorrect Date Settings: If the start and end dates of a project or task are set incorrectly, it may lead to a calculated duration that exceeds the limit.
- System Configuration: In some cases, the system may have been configured to enforce a maximum duration limit for projects or tasks.
Solution:
- Check Duration Input: Review the duration entered for the project or task. Ensure that it does not exceed 10 years. If it does, adjust the duration to be within the acceptable range.
- Adjust Start and End Dates: If the duration is calculated based on start and end dates, verify that these dates are set correctly. Adjust them as necessary to ensure the total duration is within the limit.
- Review Project Structure: If the project is part of a larger structure, ensure that the overall project timeline is realistic and adheres to the 10-year limit.
- Consult Documentation: Refer to SAP documentation or guidelines related to project management to understand any specific configurations or limitations that may apply.
- System Configuration: If you believe the limit should be adjusted, consult with your SAP administrator or technical team to see if the system configuration can be modified to accommodate longer durations, though this is generally not recommended due to potential implications on project management practices.
Related Information:
If the issue persists after following these steps, it may be beneficial to reach out to SAP support or your internal IT team for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
UMB049
Graphic type '&1': Error while reading the test data
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
UMB048
The from-value must be smaller or equal to the to-value
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
UMB051
Cockpit frame '&1' does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
UMB052
Select a cockpit frame from the list
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.