How To Fix UJB_EXCEPTION668 - BPC BPF Activity Instance Deadline Schedule


SAP Error Message - Details

  • Message type: E = Error

  • Message class: UJB_EXCEPTION - BPC: BPF Message Class

  • Message number: 668

  • Message text: BPC BPF Activity Instance Deadline Schedule

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message UJB_EXCEPTION668 - BPC BPF Activity Instance Deadline Schedule ?
    The SAP error message UJB_EXCEPTION668 related to BPC (Business Planning and Consolidation) BPF (Business Process Flow) typically indicates an issue with the scheduling of an activity instance in a BPF. This error can occur when the deadline for a scheduled activity is not met or when there are issues with the configuration of the BPF.
    Causes:
    
    Deadline Not Met: The activity instance may not have been completed by the specified deadline.
    
    Configuration Issues: There may be misconfigurations in the BPF settings, such as incorrect scheduling or dependencies. System Performance: Delays in system performance or processing times can lead to missed deadlines. User Lock: The user responsible for completing the activity may be locked or inactive. Data Issues: Missing or incorrect data can prevent the activity from being completed on time. Solutions: Check Activity Status: Review the status of the activity instance in the BPF to determine if it has been completed or if there are any errors preventing

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker