Message type: E = Error
Message class: UCF6 - Messages for Consolidation of Investments
Message number: 168
Message text: No change of control for activity &1
You have set the <ZK>Change of Control</> indicator in the investment
data of activity &V1& with investee unit &V2&.
However, in consolidation group &V3&, you have not entered a method
change with a gain or loss of control for this investee unit in the
accounting techniques.
The system does not execute a method change in consolidation group &V3&
with which activity &V1& can be linked. Therefore, it posts activity
&V1& in group &V3& as if the <ZK>Change of Control</> indicator had <ZH>
not</> been set.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
UCF6168
- No change of control for activity &1 ?The SAP error message UCF6168 "No change of control for activity &1" typically occurs in the context of SAP's Project System (PS) or related modules when there is an attempt to change the control parameters of an activity that is not allowed due to its current status or configuration.
Cause:
- Activity Status: The activity may be in a status that does not allow changes. For example, if the activity is already completed or closed, you cannot change its control parameters.
- Control Parameters: The control parameters for the activity may not be set up correctly, or the system may not allow changes to certain fields based on the configuration.
- Authorization Issues: The user may not have the necessary authorizations to make changes to the activity.
- Project Structure: The project structure may not allow changes to the activity due to dependencies or relationships with other activities.
Solution:
- Check Activity Status: Verify the status of the activity. If it is completed or closed, you may need to reopen it or create a new activity for the changes you want to make.
- Review Control Parameters: Ensure that the control parameters are correctly set up and that you are trying to change parameters that are allowed to be changed.
- Authorization Check: Ensure that you have the necessary authorizations to make changes to the activity. If not, contact your system administrator to obtain the required permissions.
- Consult Project Structure: Review the project structure and dependencies. If the activity is linked to other activities, you may need to adjust those first before making changes to the desired activity.
- Use Transaction Codes: Use relevant transaction codes (like CJ20N for Project Builder) to navigate to the activity and check its details.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant for further investigation.
Get instant SAP help. Sign up for our Free Essentials Plan.
UCF6167
No suitable entries were found
What causes this issue? No matching entries were found for the specified search string.Error message extract from SAP system. Copyright SAP SE. ...
UCF6166
R/E appropriation: Adjustment of group or minority interest is incomplete
What causes this issue? In the system utilization for consolidation of investments, you have selected the <LS>Appropriation of Retained Earning...
UCF6169
No posting for method change &1 of investee unit &2
What causes this issue? You have entered a method change as a change of control for investee unit &V2& in consolidation group &V3& (t...
UCF6170
Activity &1 is missing in the default sequence
What causes this issue? The default sequence is not saved consistently in your system. This can have a number of reasons. For example, new activities...