How To Fix UCF6168 - No change of control for activity &1


UCF6168 - Overview

  • Message type: E = Error

  • Message class: UCF6 - Messages for Consolidation of Investments

  • Message number: 168

  • Message text: No change of control for activity &1

  • Show details Hide details
  • What causes this issue?

    You have set the <ZK>Change of Control</> indicator in the investment
    data of activity &V1& with investee unit &V2&.
    However, in consolidation group &V3&, you have not entered a method
    change with a gain or loss of control for this investee unit in the
    accounting techniques.

    System Response

    The system does not execute a method change in consolidation group &V3&
    with which activity &V1& can be linked. Therefore, it posts activity
    &V1& in group &V3& as if the <ZK>Change of Control</> indicator had <ZH>
    not</> been set.

    How to fix this error?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message UCF6168 - No change of control for activity &1 ?
    The SAP error message UCF6168 "No change of control for activity &1" typically occurs in the context of SAP's Project System (PS) or related modules when there is an attempt to change the control parameters of an activity that is not allowed due to its current status or configuration.
    
    Cause: Activity Status: The activity may be in a status that does not allow changes. For example, if the activity is already completed or closed, you cannot change its control parameters. Control Parameters: The control parameters for the activity may not be set up correctly, or the system may not allow changes to certain fields based on the configuration. Authorization Issues: The user may not have the necessary authorizations to make changes to the activity. Project Structure: The project structure may not allow changes to the activity due to dependencies or relationships with other activities.
    Solution: Check Activity Status: Verify the status of the activity. If it is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author