How To Fix U7009 - Change billing period &1 <> &2 (meter readings &3 &4)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: U7 - Japan-Specific Developments

  • Message number: 009

  • Message text: Change billing period &1 <> &2 (meter readings &3 &4)

  • Show details Hide details
  • What causes this issue?

    Meter reading documents &V3& and &V4& have the <ZH>different</>
    <DS:DE.BP>BillPer</> indicators &V1& and &V2&.
    These documents were entered on the <ZH>same</> day. As a result, they
    cannot be consistently processed.
    A possible cause of this is an impermissible change in the
    <DS:TRAN.E_JBP_CUST>Customizing</> settings of <ZH>SBP/JBP</>.
    <ZH>Note:</>
    The system expects meter reading results that come from one register on
    the same day to be entered with the same category.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    INCLUDE ISU_SAP OBJECT DOKU ID TX

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message U7009 - Change billing period &1 <> &2 (meter readings &3 &4) ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant