Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: TWBHS - Test Workbench messages
Message number: 042
Message text: Test plan is not assigned to a project
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
TWBHS042
- Test plan is not assigned to a project ?The SAP error message TWBHS042 indicates that a test plan is not assigned to a project. This error typically occurs in the context of SAP Solution Manager, particularly when working with test management functionalities. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Missing Assignment: The test plan you are trying to use has not been assigned to the relevant project in SAP Solution Manager.
- Project Configuration: The project may not be properly configured to include the test plan.
- Authorization Issues: There may be authorization issues preventing the assignment of the test plan to the project.
Solution:
Assign the Test Plan to the Project:
- Navigate to the SAP Solution Manager.
- Go to the Test Management area.
- Locate the test plan that you want to assign.
- Ensure that the test plan is linked to the correct project. You can do this by editing the test plan and selecting the appropriate project from the project assignment options.
Check Project Settings:
- Verify that the project settings are correctly configured to include the test plan.
- Ensure that the project is active and that all necessary components are in place.
Review Authorizations:
- Check if you have the necessary authorizations to assign test plans to projects. If not, contact your SAP administrator to grant the required permissions.
Consult Documentation:
- Refer to the SAP Solution Manager documentation for detailed steps on managing test plans and project assignments.
Use Transaction Codes:
- You can use transaction codes like
SOLMAN_WORKCENTER
to access the Solution Manager work center and manage your test plans and projects.Related Information:
By following these steps, you should be able to resolve the TWBHS042 error and successfully assign your test plan to the appropriate project.
Get instant SAP help. Sign up for our Free Essentials Plan.
TWBHS041
Not all test cases can be tested automatically
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TWBHS040
No notes exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TWBHS043
Note deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TWBHS044
Test plan can only be changed in system &1
What causes this issue? The original system of the test plan is system &V1&. The system issues an error message and will not allow you to con...
Click on this link to search all SAP messages.