How To Fix TWBG004 - At least one project (in red) is not assigned to a cycle


TWBG004 - Overview

  • Message type: E = Error

  • Message class: TWBG - Test Workbench: GUI

  • Message number: 004

  • Message text: At least one project (in red) is not assigned to a cycle

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


TWBG004 - Details

  • The SAP error message TWBG004 indicates that there is at least one project that is not assigned to a cycle in the Project System (PS) module. This typically occurs when you are trying to execute a transaction or process that requires all projects to be linked to a specific cycle, such as a planning cycle or a project cycle.
    
    Cause: Missing Assignment: The project(s) in question have not been assigned to any cycle. This can happen if the project was created but not properly linked to a cycle. Incorrect Configuration: There may be issues with the configuration settings in the Project System that prevent the assignment of projects to cycles. Data Inconsistencies: There could be inconsistencies in the data, such as missing or incorrect entries in the project master data.
    Solution: Assign Projects to a Cycle: Navigate to the project in question using the Project Builder (transaction code CJ20N). Check the project details and ensure that it is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


TWBG004 - Related SAP Errors

  • TWBG003 No project is assigned to user &
    What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...

  • TWBG002 Test package generation error
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • TWBG005 Address data not found
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • TWBG006 Selection canceled by user
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker