Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 314
Message text: Proration of budget billing plan &1 is not necessary
The <DS:GLOS.3526BDE1AFAB52B9E10000009B38F974>portions</> of the
contracts concerned have not changed.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message TU314, which states "Proration of budget billing plan &1 is not necessary," typically occurs in the context of budget billing plans in SAP IS-U (Industry Solution for Utilities). This message indicates that the system has determined that proration of the budget billing plan is not required for the specified billing plan.
Cause: The error message TU314 can arise due to several reasons, including: No Changes in Billing Plan: The billing plan has not undergone any changes that would necessitate proration. For example, if the billing plan is already aligned with the billing cycle, proration would not be needed. Billing Plan Configuration: The configuration settings for the budget billing plan may not require proration based on the current settings or parameters defined in the system. Billing Cycle Alignment: If the billing cycle of the budget billing plan is already aligned with the actual billing periods, the system will determine that proration is
Get instant SAP help. Sign up for our Free Essentials Plan.
TU313
Document &1 is not a budget billing plan
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU312
Client &1: No BB procedure specified in table TE500 -> no conversion
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU315
Proration of budget billing plan &1 not possible
What causes this issue? Several contracts of the budget billing plan are subject to joint invoicing but have different billing dates.System Response ...
TU316
Proration of budget billing plan &1 not possible
What causes this issue? Within a portion change you can only prorate budget billing plans from the statistical procedure or the debit entry procedure...
Click on this link to search all SAP messages.