Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 039
Message text: Cannot create BB plan since no schedule recs exist on &1 for &2 &3
You have attempted to create a budget billing plan. This is not
possible because no schedule records exist on the creation date of the
budget billing plan for the portion found.
Possible reasons for this are:
The schedule records have either been deleted or not generated.
The contract contains a portion or budget billing cycle for which no
schedule records could be generated.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You have the following options:
Generate the missing schedule records for the period.
Check the allocation of the portion in the contract or installation.
Error message extract from SAP system. Copyright SAP SE.
TU039
- Cannot create BB plan since no schedule recs exist on &1 for &2 &3 ?The SAP error message TU039 indicates that the system cannot create a business blueprint (BB) plan because there are no scheduling records available for the specified object. This error typically occurs in the context of SAP Transportation Management (TM) or similar modules where planning and scheduling are critical.
Cause:
The error message TU039 is triggered when:
- No Scheduling Records Exist: The system is trying to create a business blueprint plan, but there are no existing scheduling records for the specified transportation object (e.g., shipment, delivery, etc.).
- Incorrect Object Reference: The object reference provided (e.g., &1 for the object type, &2 for the object ID, &3 for the specific details) may not correspond to any existing records in the system.
- Data Inconsistency: There may be inconsistencies in the data or configuration that prevent the creation of scheduling records.
Solution:
To resolve the TU039 error, you can take the following steps:
Check Scheduling Records:
- Verify if there are any scheduling records for the specified object. You can do this by navigating to the relevant transaction or report in SAP that displays scheduling records.
- If no records exist, you may need to create them manually or ensure that the processes that generate these records are functioning correctly.
Review Object Reference:
- Ensure that the object reference (e.g., shipment, delivery) you are using is correct and corresponds to an existing record in the system.
- Check the details provided in the error message to confirm that you are working with the right object.
Data Consistency Check:
- Perform a data consistency check to ensure that all necessary data is present and correctly configured.
- Look for any missing or incorrect entries in the master data that could affect scheduling.
Consult Documentation:
- Review SAP documentation or help resources related to the specific module you are working with (e.g., SAP TM) for additional guidance on scheduling and planning.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with SAP experts for further assistance.
Related Information:
/SCMTMS/
for Transportation Management.By following these steps, you should be able to identify the root cause of the TU039 error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
TU038
Schedule master record &1 &2 does not exist
What causes this issue? You have attempted to execute a function that requires an existing portion or meter reading unit. No portion or meter reading...
TU037
No schedule records were created
What causes this issue? No schedule records could be created with the input parameters you selected.System Response The system issues an error messa...
TU040
No control parameters exist for budget billing cycle 0
What causes this issue? The specified combination of control parameters for budget billing dates is not permitted. Please correct the parameters you ...
TU041
The budget billing cycle is already defined
What causes this issue? Each budget billing cycle can only be maintained once.System Response The system issues an error message and will not allow ...
Click on this link to search all SAP messages.