Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: TSGEN - Messages For Transaction SGEN
Message number: 210
Message text: Number of objects processed prior to this run: &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
TSGEN210
- Number of objects processed prior to this run: & ?The SAP error message TSGEN210 indicates that there is an issue related to the number of objects processed in a particular run of a transaction or program. This message typically appears during the execution of a transaction that involves generating or processing multiple objects, such as during the transport of objects or when executing a batch job.
Cause:
The error message TSGEN210 usually arises due to one of the following reasons:
Exceeding Limits: The number of objects that can be processed in a single run may have been exceeded. This can happen if the system is configured with a limit on the number of objects that can be processed at once.
System Performance: If the system is under heavy load or if there are performance issues, it may not be able to process the expected number of objects.
Configuration Issues: There may be configuration settings in the SAP system that limit the number of objects processed or that affect the execution of the transaction.
Data Integrity Issues: There may be issues with the data integrity of the objects being processed, leading to failures in processing.
Solution:
To resolve the TSGEN210 error, you can take the following steps:
Check System Logs: Review the system logs (transaction SM21) for any additional error messages or warnings that may provide more context about the issue.
Adjust Processing Limits: If applicable, check the configuration settings related to the processing limits for the transaction or program. You may need to adjust these settings to allow for more objects to be processed in a single run.
Batch Processing: If you are processing a large number of objects, consider breaking them into smaller batches and processing them in multiple runs.
Performance Monitoring: Monitor the system performance to ensure that it is not overloaded. You can use transaction ST03N to analyze workload and performance metrics.
Data Validation: Ensure that the objects being processed are valid and do not have any data integrity issues. You may need to run consistency checks or validation programs.
Consult Documentation: Refer to SAP documentation or notes related to the specific transaction or program you are using for any known issues or additional troubleshooting steps.
Contact SAP Support: If the issue persists and you cannot identify the cause, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the TSGEN210 error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
TSGEN209
Server & is used during parallel processing
If necessary, the report <DS:RE.RSPARAGENER8>RSPARAGENER8</> starts parallel jobs in dialog mode on the specified server. The servers are...
TSGEN208
Control program of the parallel processing on host & was started
Note Parallel generation jobs are controlled by the background job RSPARAGENER8 (report <DS:RE.RSPARAGENER8>RSPARAGENER8</>). RSPARAGENER...
TSGEN211
&2 parallel jobs have been scheduled to generate &1 objects
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TSGEN212
Each job processes & objects for one run
To make the parallelization process more efficient, the generation set is split into subsets, which are then processed by parallel jobs. The specifie...
Click on this link to search all SAP messages.