Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: TPM_TRIL1 - Messages from the Income Ledger
Message number: 116
Message text: Hedged item &4: Key date is before start of reclass. of equity capital
The key date of the automatic reclassification of equity capital &V1& is
before the start date of the reclassification of equity capital &V2&
from the related hedge item &V4&. The hedging instrument affected is
transaction &V3&.
The system has not reclassified the equity capital.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
TPM_TRIL1116
- Hedged item &4: Key date is before start of reclass. of equity capital ?The SAP error message TPM_TRIL1116 indicates that there is an issue with the hedged item in the context of a reclassification of equity capital. Specifically, the error states that the key date you are trying to use is before the start date of the reclassification process. This can occur in the context of Treasury and Risk Management (TRM) when dealing with hedging instruments and their associated underlying items.
Cause:
- Key Date Issue: The key date you are using for the transaction is earlier than the start date of the reclassification of equity capital. This means that the system does not allow you to perform actions on a date that is not valid in the context of the reclassification.
- Incorrect Configuration: There may be a misconfiguration in the settings related to the hedged item or the reclassification process.
- Data Entry Error: The date entered may have been incorrectly specified by the user.
Solution:
- Check Key Date: Verify the key date you are using for the transaction. Ensure that it is on or after the start date of the reclassification of equity capital.
- Review Reclassification Dates: Look into the reclassification settings and confirm the start date. Make sure that your transaction aligns with this date.
- Adjust Transaction Date: If the key date is indeed before the start date, adjust the transaction to use a valid date that is on or after the reclassification start date.
- Consult Documentation: Review SAP documentation or help resources related to Treasury and Risk Management for further guidance on handling hedged items and reclassifications.
- Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance based on your specific configuration and setup.
Related Information:
By following these steps, you should be able to resolve the TPM_TRIL1116 error and proceed with your transaction.
Get instant SAP help. Sign up for our Free Essentials Plan.
TPM_TRIL1115
Posted reclassification flows for hedged item &4 exist after key date
What causes this issue? You want to carry out an activity on &V1&. This requires that no there are no posted reclassification flows between h...
TPM_TRIL1114
Check underlying transaction for transactn &2 in CoCd &1 (see long text)
Trados Memory = TRWhat causes this issue? You carry out an action for transaction &V2& in company code &V1& for which the system dis...
TPM_TRIL1117
Hedged item &1: Only dedesignated hedging relationships are processed
Trados Memory = TRWhat causes this issue? You carry out automatic reclassification of equity capital for the hedging relationship between hedged ite...
TPM_TRIL1118
Posted hedge accounting flows for hedged item &4 exist after key date
What causes this issue? You want to carry out an activity on &V1&. This requires that no there are no posted hedge accounting flows between h...
Click on this link to search all SAP messages.