How To Fix TPM_THX1212 - No valid-from date assigned to hedging relationship &1


TPM_THX1212 - Overview

  • Message type: E = Error

  • Message class: TPM_THX1 - Treasury: Message Class for P-HA

  • Message number: 212

  • Message text: No valid-from date assigned to hedging relationship &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message TPM_THX1212 - No valid-from date assigned to hedging relationship &1 ?
    The SAP error message TPM_THX1212, which states "No valid-from date assigned to hedging relationship &1," typically occurs in the context of Treasury and Risk Management (TRM) when dealing with hedging relationships in SAP. This error indicates that a hedging relationship has not been properly configured with a valid-from date, which is essential for the system to recognize the start of the hedging relationship.
    
    Cause: Missing Valid-From Date: The hedging relationship has not been assigned a valid-from date, which is required for the system to determine when the hedging relationship becomes effective. Incorrect Configuration: The hedging relationship may not have been set up correctly in the system, leading to missing or incorrect data. Data Migration Issues: If data was migrated from another system or if there were changes made to the hedging relationship, it may have resulted in missing information.
    Solution: Assign a Valid-From Date: Navigate to the transaction code for managing hedging relationships (e.g., TPM1, TPM2, or

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker