How To Fix THM_EXPOSURE104 - The due date must be between the start &1 / end &2 of the hedge plan


THM_EXPOSURE104 - Overview

  • Message type: E = Error

  • Message class: THM_EXPOSURE - E-Hedge Accounting: Exposure

  • Message number: 104

  • Message text: The due date must be between the start &1 / end &2 of the hedge plan

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message THM_EXPOSURE104 - The due date must be between the start &1 / end &2 of the hedge plan ?
    The SAP error message THM_EXPOSURE104 indicates that there is an issue with the due date of a transaction in relation to the defined start and end dates of a hedge plan. This error typically arises in the context of Treasury and Risk Management (TRM) within SAP, particularly when dealing with hedging transactions.
    
    Cause: The error occurs when the due date of a transaction (such as a hedge or exposure) falls outside the range defined by the start and end dates of the associated hedge plan. Specifically, the due date must be between the specified start date (&1) and end date (&2) of the hedge plan. If it is not, the system will generate this error to prevent inconsistencies in the hedging process.
    Solution: To resolve this error, you can take the following steps: Check the Hedge Plan Dates: Navigate to the hedge plan in question and verify the start and end dates. Ensure that they are

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker