Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: TE - Market Risk Management
Message number: 582
Message text: Root node of risk hierarchy & assigned a sister node
The root node is alone at the very top of the hierarchy. For this
reason, no brother node can be attatched.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
TE582
- Root node of risk hierarchy & assigned a sister node ?The SAP error message TE582 typically relates to issues in the Risk Management module, particularly when dealing with risk hierarchies. This error indicates that there is a problem with the structure of the risk hierarchy, specifically that a root node is assigned a sister node, which is not allowed.
Cause:
- Hierarchy Structure Violation: The root node of a risk hierarchy should not have sister nodes. A sister node is another node that shares the same parent. In a proper hierarchy, the root node should be the topmost node without any siblings.
- Incorrect Configuration: This error can occur if the risk hierarchy has been incorrectly configured, possibly due to manual changes or incorrect data entry.
- Data Integrity Issues: There may be inconsistencies in the data that define the hierarchy, leading to this error.
Solution:
- Review the Hierarchy Structure: Check the configuration of the risk hierarchy in the SAP system. Ensure that the root node is correctly defined and does not have any sister nodes.
- Adjust Node Assignments: If you find that the root node has been incorrectly assigned sister nodes, you will need to reassign these nodes to ensure that they are either children of the root node or are structured correctly within the hierarchy.
- Use Transaction Codes: Utilize relevant transaction codes (like
GRRM_HIERARCHY
or similar) to view and edit the risk hierarchy structure.- Data Validation: Run data validation checks to ensure that all nodes in the hierarchy are correctly defined and that there are no orphaned nodes or incorrect relationships.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on configuring risk hierarchies.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with an SAP expert or support team for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
TE581
Root node of risk hierarchy & assigned a predecessor
What causes this issue? No previous node may be assigned to a root node. The ID of the previous node must be blank or 0.System Response The system ...
TE580
Root node of risk hierarchy & has wrong node category (Def:ROOT)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TE583
Risk hierarchy & contains no nodes of category ROOT (Default: 1)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TE584
Risk hierarchy & contains & nodes of category ROOT (Default: 1)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.